Brazil
Industrial Distribution Transformer Project
Country: Brazil

Application: Industrial Power Distribution
Product: Oil-Immersed Distribution Transformer
Typical Voltage: 13.8kV / 0.4kV
Frequency: 60Hz
1.Project Overview
Brazil’s industrial sector requires reliable medium-voltage distribution systems for factories, manufacturing facilities and commercial infrastructure.
For this industrial power distribution application, LBAJI developed a customized oil-immersed transformer solution designed to convert medium-voltage electricity into low-voltage power for industrial loads.
Brazil’s distribution infrastructure includes 13.8kV and 34.5kV medium-voltage systems, making 13.8kV an appropriate reference configuration for this type of project.
2.Project Challenge
The customer required:
- Reliable medium-voltage power conversion
- Stable voltage output
- Low transformer losses
- Long-term outdoor operation
- Easy maintenance
- Reliable protection
3.LBAJI Solution
LBAJI supplied an oil-immersed distribution transformer integrated with the customer’s power distribution system.
Main solution:
- 8kV oil-immersed transformer
- High-voltage terminals
- Low-voltage terminals
- Tap-changing arrangement
- Oil temperature monitoring
- Pressure relief device
- Lightning protection
- Grounding connection
4.Technical Data
| Parameter | Reference |
| Primary Voltage | 13.8kV |
| Secondary Voltage | 0.4kV |
| Frequency | 60Hz |
| Transformer Type | Oil-Immersed |
| Installation | Outdoor |
| Application | Industrial Distribution |
5.Products Supplied

Oil-Immersed Distribution Transformer
Suggested configuration:
- Primary Voltage: 13.8kV / 0.4kV
Secondary Voltage: 380/220V - Frequency: 60Hz
- Capacity: 500–2500kVA
- Cooling: ONAN
- Installation: Outdoor
Final ratings should be confirmed according to the actual project specification.
6.Manufacturing & Testing

Before shipment, the transformer undergoes a controlled production and quality inspection process.
Key production stages include:
Silicon Steel Cutting → Core Stacking → Coil Winding → Insulation → Transformer Assembly → Oil Filling → Electrical Testing → Final Inspection
Testing can include:
- Winding resistance test
- Insulation resistance test
- Ratio test
- No-load loss test
- Load loss test
- Applied voltage test
- Induced voltage test
7.Packing & Shipment

The transformer is prepared for international transportation with reinforced export packaging.
Recommended gallery:
- Finished transformer
- Product nameplate
- Protective packing
- Wooden case / steel frame
- Container loading
- Container sealing
- Port shipment
8.Installation & Commissioning

After arrival in Brazil, the equipment is unloaded and positioned on the prepared transformer foundation.
The installation process includes:
- Transformer positioning
- Cable connection
- Grounding
- Protection installation
- LV connection
- Electrical testing
- Energization
9.Customer Benefits
The proposed solution provides:
- Stable power distribution
- Reliable medium-voltage transformation
- Efficient operation
- Easy maintenance
- Long service life
- International export compatibility