{"id":2720,"date":"2026-08-23T12:04:00","date_gmt":"2026-08-23T12:04:00","guid":{"rendered":"https:\/\/lbajiele.com\/?p=2720"},"modified":"2026-08-17T00:37:34","modified_gmt":"2026-08-17T00:37:34","slug":"power-distribution-box-guide","status":"publish","type":"post","link":"https:\/\/lbajiele.com\/ar\/blog\/power-distribution-box-guide\/","title":{"rendered":"Power Distribution Box: Types, Components &#038; Selection"},"content":{"rendered":"<p><strong>A power distribution box receives one incoming supply and divides it into protected branch circuits through breakers, busbars, terminals and an enclosure.<\/strong> Selection starts with voltage, phase, load current, fault level, environment and the number of outgoing ways\u2014not enclosure size alone.<\/p>\n<div class=\"lbaji-key-takeaways\"><h2>\u0627\u0644\u0646\u0642\u0627\u0637 \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629<\/h2><ul><li>\u0627\u0628\u062f\u0623 \u0628\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u062a\u064a \u062a\u0645 \u0627\u0644\u062a\u062d\u0642\u0642 \u0645\u0646\u0647\u0627 \u0648\u0627\u0644\u0645\u0639\u064a\u0627\u0631 \u0627\u0644\u062d\u0627\u0643\u0645.<\/li><li>\u0646\u0633\u0642 \u0627\u0644\u062a\u0642\u064a\u064a\u0645\u0627\u062a\u060c \u0648\u0627\u0644\u062d\u0645\u0627\u064a\u0629\u060c \u0648\u0627\u0644\u0628\u064a\u0626\u0629\u060c \u0648\u0627\u0644\u0635\u064a\u0627\u0646\u0629 \u0643\u0642\u0631\u0627\u0631 \u0648\u0627\u062d\u062f.<\/li><li>\u0627\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u0631\u0633\u0648\u0645\u0627\u062a\u060c \u0648\u0627\u0644\u062d\u0633\u0627\u0628\u0627\u062a\u060c \u0648\u0633\u062c\u0644\u0651\u0627\u062a \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0644\u062f\u0639\u0645 \u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0634\u0631\u0627\u0621.<\/li><\/ul><\/div>\n<h2>What Is a Power Distribution Box?<\/h2><figure class=\"wp-block-image size-large\"><img decoding=\"async\" alt=\"Main breaker, busbars and outgoing feeders inside a distribution board\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/08\/main-distribution-board-internal.png\"\/><figcaption>Main breaker, busbars and outgoing feeders inside a distribution board.<\/figcaption><\/figure><p>Distribution boxes sit between an upstream source and multiple loads. Depending on the market and application, the same family may be called a distribution board, panelboard, temporary power box or splitter box. A box normally provides isolation, overcurrent protection, a neutral bar where required, and a protective-earth bar. It does not replace upstream protection or a proper grounding design.<\/p>\n<section class=\"lbaji-article-table\"><h2>\u062c\u062f\u0648\u0644 \u0645\u0642\u0627\u0631\u0646\u0629 \u0648\u0627\u062e\u062a\u064a\u0627\u0631 \u0633\u0631\u064a\u0639<\/h2><p>\u0627\u0633\u062a\u062e\u062f\u0645 \u0647\u0630\u0627 \u0627\u0644\u062c\u062f\u0648\u0644 \u0643\u0645\u0631\u0627\u062c\u0639\u0629 \u0633\u0631\u064a\u0639\u0629 \u0644\u0642\u0631\u0627\u0631\u0627\u062a \u0627\u0644\u0647\u0646\u062f\u0633\u0629 \u0648\u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629 \u0627\u0644\u062a\u064a \u062a\u0645 \u0634\u0631\u062d\u0647\u0627 \u0641\u064a \u0627\u0644\u0645\u0642\u0627\u0644.<\/p><figure class=\"wp-block-table is-style-stripes\"><table><thead><tr><th scope=\"col\">\u0645\u0646\u0637\u0642\u0629 \u0627\u0644\u0642\u0631\u0627\u0631<\/th><th scope=\"col\">\u0627\u0644\u0645\u0639\u0646\u0649 \u0627\u0644\u0639\u0645\u0644\u064a<\/th><th scope=\"col\">\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u062c\u0628 \u0627\u0644\u062a\u062d\u0642\u0642 \u0645\u0646\u0647<\/th><\/tr><\/thead><tbody><tr><td>What Is a Power Distribution Box?<\/td><td>Distribution boxes sit between an upstream source and multiple loads.<\/td><td>Depending on the market and application, the same family may be called a distribution board, panelboard, temporary power box or splitter box.<\/td><\/tr><tr><td>Main Components and Their Functions<\/td><td>The incomer provides isolation or protection; copper or aluminum busbars distribute current; branch breakers protect outgoing conductors; terminals provide controlled cable interfaces; and the enclosure limits contact\u2026<\/td><td>Metering, surge protection, residual-current protection, interlocks and sockets are application-dependent.<\/td><\/tr><tr><td>Fixed, Portable, 12 V and Custom Types<\/td><td>Fixed building boards prioritize code compliance and service access.<\/td><td>Construction-site boxes need rugged enclosures, portable cable entries and appropriate residual-current protection.<\/td><\/tr><tr><td>How to Size a Distribution Box<\/td><td>List continuous, intermittent and motor loads; apply demand and diversity only where permitted; calculate phase current; then select busbar, incomer and feeder ratings with ambient and grouping corrections.<\/td><td>Verify prospective short-circuit current against the assembly and device ratings.<\/td><\/tr><tr><td>Enclosure, IP Rating and Heat<\/td><td>Indoor clean locations may need only basic touch protection, while rain, dust, washdown or corrosive areas require a higher IP or NEMA enclosure and compatible glands.<\/td><td>A high IP rating does not guarantee corrosion resistance or thermal performance.<\/td><\/tr><\/tbody><\/table><\/figure><\/section><h2>Main Components and Their Functions<\/h2><p>The incomer provides isolation or protection; copper or aluminum busbars distribute current; branch breakers protect outgoing conductors; terminals provide controlled cable interfaces; and the enclosure limits contact and environmental exposure. Metering, surge protection, residual-current protection, interlocks and sockets are application-dependent. Every component must share compatible voltage, short-circuit and temperature ratings.<\/p>\n<p>\u0644\u063a\u0631\u0636 \u0625\u062c\u0631\u0627\u0621 \u0645\u0642\u0627\u0631\u0646\u0629 \u062e\u0627\u0635\u0629 \u0628\u0627\u0644\u0645\u0634\u0631\u0648\u0639\u060c \u064a\u062a\u0645 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u0627\u062a \u0648\u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u062a\u0635\u0645\u064a\u0645 \u0627\u0644\u0646\u0647\u0627\u0626\u064a \u0645\u0646 \u0642\u0628\u0644 \u0641\u0646\u064a\u064a\u0646 \u0643\u0647\u0631\u0628\u0627\u0626\u064a\u064a\u0646 \u0645\u0624\u0647\u0644\u064a\u0646. \u0648\u064a\u0639\u062f \u0630\u0644\u0643 \u0645\u0647\u0645\u064b\u0627 \u0628\u0634\u0643\u0644 \u062e\u0627\u0635 \u0639\u0646\u062f\u0645\u0627 \u064a\u062a\u0639\u0644\u0642 \u0627\u0644\u0623\u0645\u0631 \u0628\u0637\u0627\u0642\u0629 \u0627\u0644\u0623\u0639\u0637\u0627\u0644\u060c \u0623\u0648 \u0627\u0644\u062c\u0647\u062f \u0627\u0644\u0645\u062a\u0648\u0633\u0637\u060c \u0623\u0648 \u0648\u0627\u062c\u0647\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u0641\u0642\u060c \u0623\u0648 \u0627\u0644\u0639\u0645\u0644 \u0639\u0644\u0649 \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u062d\u064a\u0629.<\/p>\n<h2>Fixed, Portable, 12 V and Custom Types<\/h2><figure class=\"wp-block-image size-large\"><img decoding=\"async\" alt=\"Portable industrial power distribution panel with protected outlets\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/08\/portable-power-distribution-panel.png\"\/><figcaption>Portable industrial power distribution panel with protected outlets.<\/figcaption><\/figure><p>Fixed building boards prioritize code compliance and service access. Construction-site boxes need rugged enclosures, portable cable entries and appropriate residual-current protection. A 12 V DC box uses DC-rated fuses or breakers because AC devices may not interrupt DC safely. Custom boxes are justified when circuit count, connectors, monitoring, dimensions or environmental conditions cannot be met by a standard assembly.<\/p>\n<h2>How to Size a Distribution Box<\/h2><p>List continuous, intermittent and motor loads; apply demand and diversity only where permitted; calculate phase current; then select busbar, incomer and feeder ratings with ambient and grouping corrections. Verify prospective short-circuit current against the assembly and device ratings. Reserve practical spare ways, but do not oversize protection beyond conductor ampacity.<\/p>\n<p>\u0644\u063a\u0631\u0636 \u0625\u062c\u0631\u0627\u0621 \u0645\u0642\u0627\u0631\u0646\u0629 \u062e\u0627\u0635\u0629 \u0628\u0627\u0644\u0645\u0634\u0631\u0648\u0639\u060c \u064a\u062a\u0645 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0627\u0641\u062a\u0631\u0627\u0636\u0627\u062a \u0648\u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u062a\u0635\u0645\u064a\u0645 \u0627\u0644\u0646\u0647\u0627\u0626\u064a \u0645\u0646 \u0642\u0628\u0644 \u0641\u0646\u064a\u064a\u0646 \u0643\u0647\u0631\u0628\u0627\u0626\u064a\u064a\u0646 \u0645\u0624\u0647\u0644\u064a\u0646. \u0648\u064a\u0639\u062f \u0630\u0644\u0643 \u0645\u0647\u0645\u064b\u0627 \u0628\u0634\u0643\u0644 \u062e\u0627\u0635 \u0639\u0646\u062f\u0645\u0627 \u064a\u062a\u0639\u0644\u0642 \u0627\u0644\u0623\u0645\u0631 \u0628\u0637\u0627\u0642\u0629 \u0627\u0644\u0623\u0639\u0637\u0627\u0644\u060c \u0623\u0648 \u0627\u0644\u062c\u0647\u062f \u0627\u0644\u0645\u062a\u0648\u0633\u0637\u060c \u0623\u0648 \u0648\u0627\u062c\u0647\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u0641\u0642\u060c \u0623\u0648 \u0627\u0644\u0639\u0645\u0644 \u0639\u0644\u0649 \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u062d\u064a\u0629.<\/p>\n<h2>Enclosure, IP Rating and Heat<\/h2><p>Indoor clean locations may need only basic touch protection, while rain, dust, washdown or corrosive areas require a higher IP or NEMA enclosure and compatible glands. A high IP rating does not guarantee corrosion resistance or thermal performance. Estimate internal losses and solar gain; use spacing, ventilation, heat exchangers or cooling where component temperature limits would otherwise be exceeded.<\/p>\n<h2>Specification Checklist for an RFQ<\/h2><p>State the one-line diagram, system voltage and frequency, phase and neutral arrangement, maximum demand, fault level, incoming and outgoing device schedule, cable sizes and entry direction, enclosure material and rating, metering, surge protection, labeling, applicable standard, routine tests and documentation. This information lets a manufacturer quote an assembly rather than guess from a box dimension.<\/p>\n<h2>\u0645\u0627 \u062a\u0624\u0643\u062f \u0639\u0644\u064a\u0647 \u0646\u062a\u0627\u0626\u062c \u062c\u0648\u062c\u0644 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0639\u0627\u062f\u0629\u064b<\/h2><p>Our review of the current U.S. top-20 results found recurring coverage around Mini X-Treme Box\u2122 Temporary Power Distribution Center &#8211; 30A 125\/250V&#8230;, Beetle Box Spider Boxes, Main Menu, WHAT ARE THE BENEFITS OF USING A TEMPORARY POWER DISTRIBUTION BOX?, Continue Reading. This guide incorporates those decision points while keeping the scope focused on industrial procurement and engineering use.<\/p>\n<h2>\u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0630\u0627\u062a \u0627\u0644\u0635\u0644\u0629 \u0628\u0640 LBAJI<\/h2><p>\u0631\u0627\u062c\u0639 \u0645\u0627 \u0630\u064f\u0643\u0631 <a href=\"https:\/\/lbajiele.com\/ar\/product-category\/distribution-box\/\">\u0645\u062c\u0645\u0648\u0639\u0629 \u0645\u0646\u062a\u062c\u0627\u062a LBAJI<\/a> \u0648\u0627\u0644\u062f\u0627\u0639\u0645\u0629 <a href=\"https:\/\/lbajiele.com\/ar\/blog\/complete-guide-to-distribution-panels-boards-cabinets\/\">Distribution Panels, Boards &amp; Cabinets pillar guide<\/a>. \u0623\u0631\u0633\u0644 \u0627\u0644\u0645\u062e\u0637\u0637 \u0627\u0644\u0623\u062d\u0627\u062f\u064a\u060c \u0648\u0627\u0644\u0642\u062f\u0631\u0627\u062a\u060c \u0648\u0627\u0644\u0643\u0645\u064a\u0629\u060c \u0648\u0627\u0644\u0628\u064a\u0626\u0629 \u0644\u0644\u062a\u0643\u0648\u064a\u0646 \u0627\u0644\u062e\u0627\u0635 \u0628\u0627\u0644\u0645\u0634\u0631\u0648\u0639.<\/p>\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<\/div>\n<\/div>\n<section class=\"lbaji-decision-aid\"><h2>\u0633\u064a\u0631 \u0639\u0645\u0644 \u0627\u0644\u062a\u0642\u064a\u064a\u0645 \u0627\u0644\u0639\u0645\u0644\u064a<\/h2><p>For power distribution box, use a documented workflow rather than a catalogue-only choice. First freeze system inputs and operating limits. Next compare the available construction or service options against the actual environment. Then verify calculations, protection interfaces and acceptance tests. Finally, record approved deviations and preserve baseline results for commissioning and maintenance.<\/p><ol><li>Review main components and their functions and record the project-specific decision.<\/li><li>Review fixed, portable, 12 v and custom types and record the project-specific decision.<\/li><li>Review how to size a distribution box and record the project-specific decision.<\/li><li>Review enclosure, ip rating and heat and record the project-specific decision.<\/li><\/ol><\/section><section class=\"lbaji-acceptance-records\"><h2>\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0642\u0628\u0648\u0644 \u0627\u0644\u0645\u0631\u0627\u062f \u0627\u0644\u0627\u062d\u062a\u0641\u0627\u0638 \u0628\u0647\u0627<\/h2><p>\u0627\u0644\u0627\u062d\u062a\u0641\u0627\u0638 \u0628\u0635\u062d\u064a\u0641\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0645\u0639\u062a\u0645\u062f\u0629\u060c \u0648\u0627\u0644\u0631\u0633\u0648\u0645\u0627\u062a\u060c \u0648\u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0627\u0646\u062d\u0631\u0627\u0641\u0627\u062a\u060c \u0648\u0634\u0647\u0627\u062f\u0627\u062a \u0627\u0644\u0645\u0648\u0627\u062f \u0639\u0646\u062f \u0627\u0644\u0627\u0642\u062a\u0636\u0627\u0621\u060c \u0648\u062a\u0642\u0627\u0631\u064a\u0631 \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631\u0627\u062a \u0627\u0644\u0631\u0648\u062a\u064a\u0646\u064a\u0629 \u0648\u0627\u0644\u062e\u0627\u0635\u0629\u060c \u0648\u0625\u0639\u062f\u0627\u062f\u0627\u062a \u0627\u0644\u062d\u0645\u0627\u064a\u0629\u060c \u0648\u0646\u062a\u0627\u0626\u062c \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062a\u062c\u0631\u064a\u0628\u064a\u060c \u0648\u0627\u0644\u0635\u0648\u0631 \u0627\u0644\u0641\u0648\u062a\u0648\u063a\u0631\u0627\u0641\u064a\u0629\u060c \u0648\u062a\u0641\u0627\u0635\u064a\u0644 \u0644\u0648\u062d\u0629 \u0627\u0644\u0627\u0633\u0645 \u0627\u0644\u0646\u0647\u0627\u0626\u064a\u0629. \u062a\u0633\u062c\u064a\u0644 \u0638\u0631\u0648\u0641 \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0628\u0627\u0644\u0625\u0636\u0627\u0641\u0629 \u0625\u0644\u0649 \u0627\u0644\u0642\u064a\u0645\u060c \u0644\u0623\u0646 \u062f\u0631\u062c\u0629 \u0627\u0644\u062d\u0631\u0627\u0631\u0629 \u0648\u0637\u0631\u064a\u0642\u0629 \u0627\u0644\u062c\u0647\u0627\u0632 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u064a\u0645\u0643\u0646 \u0623\u0646 \u062a\u0624\u062b\u0631 \u0639\u0644\u0649 \u0627\u0644\u0645\u0642\u0627\u0631\u0646\u0629. \u062a\u0646\u0634\u0626 \u0647\u0630\u0647 \u0627\u0644\u0645\u0633\u062a\u0646\u062f\u0627\u062a \u0627\u0644\u0623\u0633\u0627\u0633 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645 \u0644\u0644\u062a\u062d\u0642\u064a\u0642 \u0641\u064a \u0627\u0644\u0625\u0646\u0630\u0627\u0631\u0627\u062a \u0627\u0644\u0644\u0627\u062d\u0642\u0629\u060c \u0623\u0648 \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0627\u0644\u0623\u062d\u0645\u0627\u0644\u060c \u0623\u0648 \u0627\u0644\u062a\u062f\u0647\u0648\u0631. \u0643\u0645\u0627 \u0623\u0646\u0647\u0627 \u062a\u0645\u0646\u0639 \u0637\u0644\u0628 \u0645\u0639\u062f\u0627\u062a \u0628\u062f\u064a\u0644\u0629 \u0628\u0646\u0627\u0621\u064b \u0639\u0644\u0649 \u0648\u0635\u0641 \u063a\u064a\u0631 \u0645\u0643\u062a\u0645\u0644 \u0628\u0639\u062f \u062a\u063a\u064a\u0631 \u0627\u0644\u0623\u0641\u0631\u0627\u062f \u0623\u0648 \u0627\u0644\u0645\u0648\u0631\u062f\u064a\u0646.<\/p><\/section><section class=\"lbaji-technical-references\"><h2>\u0627\u0644\u0645\u0631\u0627\u062c\u0639 \u0627\u0644\u0641\u0646\u064a\u0629 \u0648\u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0625\u0636\u0627\u0641\u064a\u0629<\/h2><ul><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32338\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">IEC 61439-1 low-voltage switchgear and controlgear assemblies<\/a><\/li><li><a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1910\/1910.303\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">\u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0644\u0625 OSHA<\/a><\/li><li><a href=\"https:\/\/www.nema.org\/membership\/products\/view\/enclosures-for-electrical-equipment\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">NEMA enclosure type guidance<\/a><\/li><\/ul><\/section>\n<h2>\u062e\u0627\u062a\u0645\u0629<\/h2><p>A power distribution box receives one incoming supply and divides it into protected branch circuits through breakers, busbars, terminals and an enclosure. Selection starts with voltage, phase, load current, fault level, environment and the number of outgoing ways\u2014not enclosure size alone. Use project data and documented acceptance criteria before purchase, installation or service.<\/p>","protected":false},"excerpt":{"rendered":"<p>A power distribution box receives one incoming supply and divides it into protected branch circuits through breakers, busbars, terminals and an enclosure. Selection starts with voltage, phase, load current, fault level,\u2026<\/p>","protected":false},"author":6,"featured_media":2719,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[55],"tags":[82,83],"class_list":["post-2720","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-distribution-panels-cabinets","tag-distribution-panels","tag-power-distribution"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts\/2720","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/comments?post=2720"}],"version-history":[{"count":2,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts\/2720\/revisions"}],"predecessor-version":[{"id":2779,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts\/2720\/revisions\/2779"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/media\/2719"}],"wp:attachment":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/media?parent=2720"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/categories?post=2720"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/tags?post=2720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}