{"id":2869,"date":"2026-08-27T06:46:00","date_gmt":"2026-08-27T06:46:00","guid":{"rendered":"https:\/\/lbajiele.com\/?p=2869"},"modified":"2026-08-25T12:10:03","modified_gmt":"2026-08-25T12:10:03","slug":"electric-substation-design-software-guide","status":"publish","type":"post","link":"https:\/\/lbajiele.com\/ar\/blog\/electric-substation-design-software-guide\/","title":{"rendered":"\u0628\u0631\u0646\u0627\u0645\u062c \u062a\u0635\u0645\u064a\u0645 \u0627\u0644\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629: \u0627\u0644\u0623\u062f\u0648\u0627\u062a\u060c \u0633\u064a\u0631 \u0639\u0645\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a\u060c \u0648\u0627\u0644\u0627\u062e\u062a\u064a\u0627\u0631"},"content":{"rendered":"<p><strong>Substation design software is a coordinated toolchain rather than one program: engineers combine network studies, protection tools, CAD or BIM, physical-clearance and grounding models, cable databases, document control and sometimes 3D digital twins.<\/strong> Software selection should follow deliverables, data exchange, standards, team skills and lifecycle ownership. A visually impressive model cannot replace validated electrical calculations or controlled source data.<\/p>\n<div class=\"lbaji-key-takeaways\"><h2>\u0627\u0644\u0646\u0642\u0627\u0637 \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629<\/h2><ul><li>Start from required engineering deliverables and interfaces.<\/li><li>Maintain one controlled equipment and cable data source.<\/li><li>Validate models, assumptions and software versions before relying on results.<\/li><\/ul><\/div>\n<h2>Software Categories in a Substation Project<\/h2><figure class=\"wp-block-image size-large\"><img decoding=\"async\" alt=\"Three-dimensional substation design review\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/08\/3d-substation-design-review.png\"\/><figcaption>Three-dimensional substation design review.<\/figcaption><\/figure>\n<p>Power-system analysis tools perform load flow, short circuit, motor starting, harmonics, arc-flash inputs and transient studies. Protection tools support relay coordination, settings and event analysis. Grounding tools calculate touch and step potentials using soil data and fault-current assumptions.<\/p>\n<p>CAD, electrical CAD and BIM platforms produce single-lines, schematics, wiring, panel layouts, plans, sections, bills of material and cable schedules. 3D tools help check clearances, access, clashes and constructability.<\/p>\n<h2>Data Workflow and Model Governance<\/h2>\n<p>Define which system owns each value: equipment rating, CT ratio, cable length, terminal number, relay setting and document revision. Uncontrolled duplication creates conflicting drawings and studies. Use stable equipment identifiers and a documented exchange format between tools.<\/p>\n<p>Record software version, library revision, study assumptions and approval status. A model should be reproducible by another engineer and traceable to survey, utility, manufacturer and project inputs.<\/p>\n<h2>Interoperability, Automation and Digital Twins<\/h2><figure class=\"wp-block-image size-large\"><img decoding=\"async\" alt=\"Electrical substation equipment layout\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/08\/electrical-substation-equipment-layout.png\"\/><figcaption>Electrical substation equipment layout.<\/figcaption><\/figure>\n<p>Useful exchange formats may include DWG\/DXF, IFC, spreadsheets, databases and protection-setting files. Import\/export claims should be tested with project samples because object intelligence, units and naming may be lost even when geometry transfers.<\/p>\n<p>Automation can generate drawings, cable lists and reports from structured data, reducing repeated entry. A digital twin adds value only when commissioning and maintenance updates keep the model aligned with the installed asset.<\/p>\n<h2>Substation Software Category Comparison<\/h2><figure class=\"wp-block-table is-style-stripes\"><table><thead><tr><th scope=\"col\">Category<\/th><th scope=\"col\">Primary output<\/th><th scope=\"col\">Critical inputs<\/th><th scope=\"col\">Acceptance check<\/th><\/tr><\/thead><tbody><tr><td>Network studies<\/td><td>Load flow and fault results<\/td><td>Source, equipment, cables and operating cases<\/td><td>Benchmark case and peer review<\/td><\/tr><tr><td>\u062d\u0645\u0627\u064a\u0629<\/td><td>Coordination plots and settings<\/td><td>CTs, curves, fault currents and breaker times<\/td><td>Independent settings review<\/td><\/tr><tr><td>Grounding<\/td><td>Grid design and touch\/step results<\/td><td>Soil model, fault split and clearing time<\/td><td>Field soil data and calculation audit<\/td><\/tr><tr><td>CAD\/BIM\/3D<\/td><td>Drawings, schedules and coordinated layout<\/td><td>Equipment models, standards and survey<\/td><td>Clash, clearance and document checks<\/td><\/tr><tr><td>Asset\/digital twin<\/td><td>Lifecycle equipment record<\/td><td>As-built and maintenance data<\/td><td>Update process and ownership<\/td><\/tr><\/tbody><\/table><\/figure>\n<h2>How to Evaluate a Software Stack<\/h2>\n<p>Create representative pilot tasks: update a one-line, run a fault study, change a CT, route cables, check a clearance and issue a revision. Score accuracy, auditability, library control, collaboration, performance, vendor support and export quality.<\/p>\n<p>Include licensing model, offline access, cybersecurity, training, customization and long-term data portability. Avoid a tool that locks essential project data into an inaccessible proprietary format without a migration plan.<\/p>\n<h2>\u0627\u0644\u062a\u062d\u0642\u0642 \u0627\u0644\u0647\u0646\u062f\u0633\u064a \u0648\u062d\u062f\u0648\u062f \u0627\u0644\u0623\u0645\u0627\u0646<\/h2><p>\u064a\u0648\u0641\u0631 \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u062f\u0639\u0645\u0627\u064b \u0644\u0644\u0645\u0648\u0627\u0635\u0641\u0627\u062a \u0648\u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a\u061b \u0648\u0647\u0648 \u0644\u0627 \u064a\u063a\u0646\u064a \u0639\u0646 \u062f\u0631\u0627\u0633\u0629 \u0627\u0644\u0645\u0634\u0631\u0648\u0639\u060c \u0623\u0648 \u0627\u0644\u0643\u0648\u062f \u0627\u0644\u0645\u0639\u0645\u0648\u0644 \u0628\u0647\u060c \u0623\u0648 \u062a\u0639\u0644\u064a\u0645\u0627\u062a \u0627\u0644\u0645\u0635\u0646\u0639\u060c \u0623\u0648 \u0623\u0639\u0645\u0627\u0644 \u0637\u0627\u0642\u0645 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0621 \u0627\u0644\u0645\u0624\u0647\u0644. \u062a\u062d\u0642\u0642 \u0645\u0645\u0651\u0627 \u064a\u0644\u064a \u0642\u0628\u0644 \u0627\u062e\u062a\u064a\u0627\u0631 \u0627\u0644\u0645\u0639\u062f\u0627\u062a\u060c \u0623\u0648 \u0627\u062e\u062a\u0628\u0627\u0631\u0647\u0627\u060c \u0623\u0648 \u062a\u0648\u0635\u064a\u0644 \u0623\u0633\u0644\u0627\u0643\u0647\u0627\u060c \u0623\u0648 \u062a\u0634\u063a\u064a\u0644\u0647\u0627:<\/p><ul><li>Validate calculation engines against known benchmark cases.<\/li><li>Control units, libraries, naming, revisions and user permissions.<\/li><li>Verify clearances with the governing standard and manufacturer drawings.<\/li><li>Protect project and infrastructure data through cybersecurity controls.<\/li><li>Require engineering review; do not accept automated output without checking assumptions.<\/li><\/ul>\n<h2>\u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0627\u0644\u0645\u0631\u0627\u062f \u062a\u0636\u0645\u064a\u0646\u0647\u0627 \u0641\u064a \u0637\u0644\u0628 \u0639\u0631\u0636 \u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/h2><p>\u064a\u062c\u0628 \u0623\u0646 \u062a\u0633\u062a\u0646\u062f \u0623\u064a \u0639\u0631\u0636 \u0623\u0633\u0639\u0627\u0631 \u0645\u0641\u064a\u062f \u0625\u0644\u0649 \u0646\u0641\u0633 \u0627\u0644\u062d\u062f\u0648\u062f \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0644\u0643\u0644 \u0645\u064f\u0648\u0631\u0650\u0651\u062f. \u062a\u0636\u0645\u064a\u0646 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a \u0627\u0644\u062a\u0627\u0644\u064a\u0629 \u0648\u0645\u0637\u0627\u0644\u0628\u0629 \u0628\u0630\u0643\u0631 \u062c\u0645\u064a\u0639 \u0627\u0644\u0627\u0646\u062d\u0631\u0627\u0641\u0627\u062a \u0635\u0631\u0627\u062d\u0629\u064b:<\/p><ul><li>Required studies, drawings, schedules, models and handover formats.<\/li><li>Team size, locations, collaboration and approval workflow.<\/li><li>Existing software, data sources, libraries and integration needs.<\/li><li>Standards, units, languages, cybersecurity and hosting constraints.<\/li><li>Licensing, training, support, customization and data-exit provisions.<\/li><\/ul>\n<h2>\u0645\u0646 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0641\u0646\u064a\u0629 \u0625\u0644\u0649 \u0642\u0631\u0627\u0631 \u0645\u0639\u062a\u0645\u062f<\/h2><p>Use a staged review rather than approving the first catalogue match. Begin with software categories in a substation project, then reconcile data workflow and model governance with interoperability, automation and digital twins. Complete the review with how to evaluate a software stack. At each stage, record the source document, units, operating case and person responsible for approval. This prevents a value copied from an old drawing, nominal system label or unrelated product from becoming an uncontrolled design input.<\/p><p>\u0642\u0628\u0644 \u0627\u0644\u0642\u0628\u0648\u0644\u060c \u0642\u0627\u0631\u0646 \u0627\u0633\u062a\u062c\u0627\u0628\u0629 \u0627\u0644\u0645\u0648\u0631\u062f \u0628\u0646\u062f\u0627\u064b \u0628\u0646\u062f\u0627\u064b \u0645\u0639 \u0637\u0644\u0628 \u062a\u0642\u062f\u064a\u0645 \u0627\u0644\u0642\u062d\u0648\u0635\u0627\u062a \u0648\u062d\u062f\u062f \u0643\u0644 \u0627\u0633\u062a\u062b\u0646\u0627\u0621. \u062a\u0623\u0643\u062f \u0645\u0646 \u0623\u0646 \u0627\u0644\u0631\u0633\u0648\u0645\u0627\u062a\u060c \u0648\u0627\u0644\u062d\u0633\u0627\u0628\u0627\u062a\u060c \u0648\u0627\u0644\u0625\u0639\u062f\u0627\u062f\u0627\u062a\u060c \u0648\u0627\u0644\u0634\u0647\u0627\u062f\u0627\u062a\u060c \u0648\u062a\u0642\u0627\u0631\u064a\u0631 \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u062a\u0634\u064a\u0631 \u0625\u0644\u0649 \u0627\u0644\u0637\u0631\u0627\u0632 \u0648\u0627\u0644\u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u0645\u0642\u062f\u0645\u064a\u0646 \u0628\u062f\u0642\u0629. \u0627\u062d\u062a\u0641\u0638 \u0628\u0627\u0644\u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u0645\u0642\u062f\u0645\u0629 \u0627\u0644\u0645\u0639\u062a\u0645\u062f\u0629\u060c \u0648\u0628\u064a\u0627\u0646\u0627\u062a \u0644\u0648\u062d\u0629 \u0627\u0644\u0627\u0633\u0645\u060c \u0648\u0646\u062a\u0627\u0626\u062c \u0627\u0644\u0645\u0635\u0646\u0639\u060c \u0648\u0642\u064a\u0627\u0633\u0627\u062a \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0643\u062e\u0637 \u0623\u0633\u0627\u0633 \u0644\u0644\u0635\u064a\u0627\u0646\u0629. \u0625\u0630\u0627 \u062a\u063a\u064a\u0631 \u0627\u0644\u062a\u0642\u064a\u064a\u0645\u060c \u0623\u0648 \u0627\u0644\u062a\u0648\u0635\u064a\u0644\u060c \u0623\u0648 \u0627\u0644\u0628\u064a\u0626\u0629\u060c \u0623\u0648 \u0634\u0631\u0637 \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631\u060c \u0641\u0623\u0639\u062f \u0627\u0644\u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u0645\u062a\u0623\u062b\u0631\u0629 \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0627\u0641\u062a\u0631\u0627\u0636 \u0623\u0646 \u0627\u0644\u0627\u0633\u062a\u0646\u062a\u0627\u062c \u0627\u0644\u0623\u0635\u0644\u064a \u064a\u0638\u0644 \u0633\u0627\u0631\u064a\u0627\u064b.<\/p>\n<p>\u064a\u062c\u0628 \u0623\u0646 \u062a\u062d\u062f\u062f \u0645\u0631\u0627\u0642\u0628\u0629 \u0627\u0644\u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u0645\u0631\u0627\u062c\u0639\u0629\u060c \u0648\u062d\u0627\u0644\u0629 \u0627\u0644\u0645\u0648\u0627\u0641\u0642\u0629\u060c \u0648\u0627\u0644\u0645\u0644\u0641\u0627\u062a \u0627\u0644\u0645\u0644\u063a\u0627\u0629. \u064a\u062c\u0628 \u0623\u0646 \u062a\u062a\u0644\u0642\u0649 \u0627\u0644\u0641\u0631\u0642 \u0627\u0644\u0645\u064a\u062f\u0627\u0646\u064a\u0629 \u0646\u0641\u0633 \u0627\u0644\u0642\u064a\u0645 \u0627\u0644\u0645\u0639\u062a\u0645\u062f\u0629 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u0629 \u0644\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a\u060c \u0628\u064a\u0646\u0645\u0627 \u064a\u062c\u0628 \u0623\u0646 \u062a\u0633\u062c\u0644 \u0633\u062c\u0644\u0627\u062a \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u062a\u062c\u0631\u064a\u0628\u064a \u0623\u064a \u062a\u063a\u064a\u064a\u0631 \u0645\u0635\u0631\u062d \u0628\u0647 \u062a\u0645 \u0625\u062c\u0631\u0627\u0621\u0647 \u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u062a\u0631\u0643\u064a\u0628. \u062a\u064f\u0639\u062f \u0647\u0630\u0647 \u0627\u0644\u0642\u0627\u0628\u0644\u064a\u0629 \u0644\u0644\u062a\u062a\u0628\u0639 \u0645\u0647\u0645\u0629 \u0628\u0634\u0643\u0644 \u062e\u0627\u0635 \u0639\u0646\u062f\u0645\u0627 \u064a\u062a\u0645 \u0627\u0633\u062a\u0628\u062f\u0627\u0644 \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0628\u0639\u062f \u0633\u0646\u0648\u0627\u062a: \u0641\u0627\u0644\u0645\u0647\u0646\u062f\u0633 \u0627\u0644\u062a\u0627\u0644\u064a \u064a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0648\u0627\u062c\u0647\u0627\u062a \u0645\u064f\u062a\u062d\u0642\u0642 \u0645\u0646\u0647\u0627 \u0648\u0633\u062c\u0644 \u0627\u062e\u062a\u0628\u0627\u0631\u0627\u062a\u060c \u0648\u0644\u064a\u0633 \u0648\u0635\u0641\u0627\u064b \u063a\u064a\u0631 \u0645\u0643\u062a\u0645\u0644 \u0645\u0646\u0642\u0648\u0644\u0627\u064b \u0645\u0646 \u0623\u0645\u0631 \u0634\u0631\u0627\u0621.<\/p>\n<h2>\u062a\u063a\u0637\u064a\u0629 \u0645\u0633\u062a\u0646\u062f\u0629 \u0625\u0644\u0649 \u0646\u062a\u0627\u0626\u062c \u0627\u0644\u0628\u062d\u062b \u0627\u0644\u062d\u0627\u0644\u064a\u0629<\/h2><p>The current U.S. Google top-20 review repeatedly surfaced themes including ETAP Electrical Power Systems Design Software, Electric Substation Design Solution, 3D Modeling Capabilities, Optimize Substation Design and Analysis, Renewable Energy Integration. The article addresses those user needs in an original engineering and procurement sequence; competitor brand navigation and unrelated sales material were excluded.<\/p>\n<h2>\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0630\u0627\u062a \u0627\u0644\u0635\u0644\u0629 \u0628\u0640 LBAJI<\/h2><p>\u062a\u0627\u0628\u0639 \u0645\u0639 <a href=\"https:\/\/lbajiele.com\/ar\/blog\/complete-guide-to-substation-design-layout-components\/\">substation design guide<\/a> <a href=\"https:\/\/lbajiele.com\/ar\/blog\/electrical-substation-engineering-guide\/\">substation engineering guide<\/a> <a href=\"https:\/\/lbajiele.com\/ar\/product-category\/substation\/\">substation equipment range<\/a>. \u062a\u0633\u0627\u0639\u062f \u0647\u0630\u0647 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0641\u064a \u0631\u0628\u0637 \u0627\u0644\u062d\u0633\u0627\u0628 \u0623\u0648 \u0642\u0631\u0627\u0631 \u0627\u0644\u0645\u0643\u0648\u0646 \u0628\u0645\u0648\u0627\u0635\u0641\u0627\u062a \u0643\u0627\u0645\u0644\u0629 \u0644\u0644\u0645\u062d\u0648\u0644\u060c \u0623\u0648 \u0627\u0644\u0645\u0641\u0627\u062a\u064a\u062d \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629\u060c \u0623\u0648 \u0627\u0644\u062a\u062d\u0643\u0645\u060c \u0623\u0648 \u0627\u0644\u062a\u0648\u0632\u064a\u0639.<\/p>\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<\/div>\n<\/div>\n<section class=\"lbaji-technical-references\"><h2>\u0627\u0644\u0645\u0631\u0627\u062c\u0639 \u0627\u0644\u0641\u0646\u064a\u0629 \u0648\u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0625\u0636\u0627\u0641\u064a\u0629<\/h2><ul><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/6028\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">IEC 61850<\/a> \u2014 Substation communication architecture and data models.<\/li><li><a href=\"https:\/\/www.nist.gov\/cyberframework\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">\u0625\u0637\u0627\u0631 \u0639\u0645\u0644 \u0627\u0644\u0623\u0645\u0646 \u0627\u0644\u0633\u064a\u0628\u0631\u0627\u0646\u064a \u0627\u0644\u0635\u0627\u062f\u0631 \u0639\u0646 \u0645\u0639\u0647\u062f \u0627\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0648\u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0648\u0637\u0646\u064a (NIST)<\/a> \u2014 Cybersecurity risk-management guidance.<\/li><li><a href=\"https:\/\/www.buildingsmart.org\/standards\/bsi-standards\/industry-foundation-classes\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">buildingSMART IFC<\/a> \u2014 Open BIM data-exchange standard context.<\/li><\/ul><\/section>\n<h2>\u062e\u0627\u062a\u0645\u0629<\/h2><p>Select substation software as a governed engineering workflow. The winning stack produces traceable studies and coordinated deliverables, preserves data ownership, survives revision changes and can be maintained throughout the asset lifecycle.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u0628\u0631\u0645\u062c\u064a\u0627\u062a \u062a\u0635\u0645\u064a\u0645 \u0627\u0644\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0641\u0631\u0639\u064a\u0629 \u0647\u064a \u0639\u0628\u0627\u0631\u0629 \u0639\u0646 \u0633\u0644\u0633\u0644\u0629 \u0623\u062f\u0648\u0627\u062a \u0645\u062a\u0631\u0627\u0628\u0637\u0629 \u0648\u0644\u064a\u0633\u062a \u0645\u062c\u0631\u062f \u0628\u0631\u0646\u0627\u0645\u062c \u0648\u0627\u062d\u062f: \u062d\u064a\u062b \u064a\u062c\u0645\u0639 \u0627\u0644\u0645\u0647\u0646\u062f\u0633\u0648\u0646 \u0628\u064a\u0646 \u062f\u0631\u0627\u0633\u0627\u062a \u0627\u0644\u0634\u0628\u0643\u0627\u062a\u060c \u0648\u0623\u062f\u0648\u0627\u062a \u0627\u0644\u062d\u0645\u0627\u064a\u0629\u060c \u0648\u0628\u0631\u0627\u0645\u062c \u0627\u0644\u062a\u0635\u0645\u064a\u0645 \u0628\u0645\u0633\u0627\u0639\u062f\u0629 \u0627\u0644\u062d\u0627\u0633\u0648\u0628 (CAD) \u0623\u0648 \u0646\u0645\u0630\u062c\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621 (BIM)\u060c \u0648\u0646\u0645\u0627\u0630\u062c \u0627\u0644\u062e\u0644\u0648\u0635 \u0627\u0644\u0641\u064a\u0632\u064a\u0627\u0626\u064a \u0648\u0627\u0644\u062a\u0623\u0631\u064a\u0636\u060c \u0648\u0642\u0648\u0627\u0639\u062f \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0643\u0627\u0628\u0644\u0627\u062a\u060c \u0648\u0627\u0644\u062a\u062d\u0643\u0645 \u0641\u064a \u0627\u0644\u0645\u0633\u062a\u0646\u062f\u0627\u062a...<\/p>","protected":false},"author":6,"featured_media":2868,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[54],"tags":[83,80,72],"class_list":["post-2869","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-substations","tag-power-distribution","tag-substation-design","tag-transformer-components"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts\/2869","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/comments?post=2869"}],"version-history":[{"count":1,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts\/2869\/revisions"}],"predecessor-version":[{"id":3012,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts\/2869\/revisions\/3012"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/media\/2868"}],"wp:attachment":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/media?parent=2869"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/categories?post=2869"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/tags?post=2869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}