{"id":4575,"date":"2026-10-19T13:00:00","date_gmt":"2026-10-19T13:00:00","guid":{"rendered":"https:\/\/lbajiele.com\/?p=4575"},"modified":"2026-10-20T16:52:00","modified_gmt":"2026-10-20T16:52:00","slug":"switchgear-control-voltage-guide","status":"publish","type":"post","link":"https:\/\/lbajiele.com\/ar\/blog\/switchgear-control-voltage-guide\/","title":{"rendered":"Switchgear Control Voltage: Auxiliary Supply and Interface Specification"},"content":{"rendered":"<p>Switchgear control voltage is the specified electrical supply used by auxiliary and control functions, such as operating coils, mechanisms, relays and indications. It is different from the main-circuit voltage carried by the switchgear. For procurement, identify each function, its required supply and the conditions at its terminals. Do not select a control voltage from the main voltage rating or a photograph of a control panel. The useful deliverable is an agreed auxiliary-supply schedule connected to the schematic, equipment data and project operating philosophy. That schedule should also explain what happens when a supply is lost and who is responsible for each interface.<\/p>\n<h2>Separate the main circuit from auxiliary functions<\/h2>\n<p>A medium-voltage assembly can include low-voltage auxiliary circuits whose purposes and supplies differ. Trip and close functions, protection electronics, communications, indications and other loads should be identified separately. One cabinet may therefore contain more than one relevant voltage and more than one source. A headline statement that simply says \u201ccontrol voltage\u201d can leave important equipment interfaces unresolved.<\/p>\n<p>Start with an auxiliary-load list linked to the schematic. For each item, record its function, supply type, rated value, manufacturer requirements and source. Do not assume that a relay\u2019s power input and the contacts through which it commands another device share the same supply. A clear functional description prevents confusion between an electronic device supply, a control signal and an operating-coil circuit.<\/p>\n<h2>Decide AC or DC from the operating philosophy<\/h2>\n<p>The choice between AC and DC depends on the required function, available supply system, equipment options and the owner\u2019s reliability requirements. An independently supported DC system can serve functions that must remain available when the normal AC source is absent, but its usefulness depends on the actual battery, charger, distribution and monitoring design. The label \u201cDC control\u201d alone proves none of those capabilities.<\/p>\n<p>An AC arrangement also needs a documented assessment of its source and the consequences of loss. Some equipment can use different stored-energy or operating arrangements, so identify the proposed construction rather than forcing all designs into one assumption. The electrical designer and manufacturer should agree how each required action is supported in the credible operating states of the installation.<\/p>\n<figure><img decoding=\"async\" alt=\"KYN61-40.5 Armouring Removable AC Metal Enclosed Switchgear complete enclosure exterior\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-control-voltage-guide-body1-20261017.png\" style=\"max-width:100%;height:auto\"\/><figcaption>Exterior product-reference illustration for auxiliary-interface planning. No control-circuit wiring or confirmed coil voltage is depicted.<\/figcaption><\/figure><h2>Read device requirements at the right terminals<\/h2>\n<p>Rated supply voltage is only part of the device information. The manufacturer\u2019s permissible operating range, frequency where applicable, power demand and duty requirements also matter. Obtain the data for the actual ordered device variant. Two physically similar coils or mechanisms can have different electrical requirements, making appearance an unreliable way to select spares or approve substitutions.<\/p>\n<p>Review the voltage at the relevant equipment terminals under the specified operating condition, not only at the source panel. Contacts, protective devices, connectors and conductors lie between those points. The resulting assessment must consider the complete circuit and its operating demand. Do not apply an arbitrary percentage window to every device; the applicable product requirements and supplied manufacturer data establish the criteria.<\/p>\n<h2>Account for transient demand and simultaneous actions<\/h2>\n<p>Auxiliary loads do not all behave like steady lighting loads. A mechanism or operating coil may impose a short-duration demand that differs from its steady condition. Request the supplier\u2019s load information in a form the auxiliary-system designer can use. Include operating duration, duty limitations and any restrictions on repeated operations where the manufacturer specifies them.<\/p>\n<p>The owner should identify which actions are credibly simultaneous and which are controlled by the operating philosophy. This provides a sound basis for evaluating source capacity and distribution. Avoid sizing a supply by adding convenient catalogue wattages without understanding the actual functions. Equally, do not assume that diversity eliminates a required simultaneous operation. Keep the agreed assumptions with the equipment schedule for later maintenance and expansion work.<\/p>\n<h2>Create an auxiliary-supply interface matrix<\/h2>\n<p>The matrix below is an original qualitative procurement checklist. It organizes responsibilities and evidence without prescribing a universal circuit design or safe work procedure. Each project should add its own identifiers and acceptance criteria, reviewed by the responsible electrical engineer and manufacturer.<\/p>\n<p>\u0633\u064a\u0627\u0642 \u0627\u0644\u0645\u0631\u0627\u062c\u0639: <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/71439\" rel=\"noopener nofollow\" target=\"_blank\">IEC 62271-1:2017 with Amendment 1:2021 common specifications scope<\/a>. \u062a\u064f\u0639\u062f \u0647\u0630\u0647 \u0627\u0644\u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0645\u0631\u062c\u0639\u064a\u0629 \u0627\u0644\u0646\u0648\u0639\u064a\u0629 \u0627\u0644\u0623\u0635\u0644\u064a\u0629 \u0645\u0646\u0638\u0645\u0629\u064b \u0644\u0644\u0642\u0631\u0627\u0631\u0627\u062a \u0627\u0644\u0645\u062a\u0639\u0644\u0642\u0629 \u0628\u0627\u0644\u0645\u0634\u0631\u0648\u0639\u061b \u0648\u0647\u064a \u0644\u064a\u0633\u062a \u0645\u0639\u064a\u0627\u0631\u064b\u0627 \u0645\u064f\u0639\u0627\u062f \u062a\u0635\u0646\u064a\u0641\u0647 \u0623\u0648 \u0628\u062f\u064a\u0644\u064b\u0627 \u0644\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0627\u0644\u0645\u0639\u062a\u0645\u062f\u0629.<\/p><div class=\"lbaji-table-scroll\" style=\"max-width:100%;overflow-x:auto\"><table style=\"width:100%;border-collapse:collapse\"><thead><tr><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Function or interface<\/th><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Information to request<\/th><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Acceptance question<\/th><\/tr><\/thead><tbody>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Trip and close functions<\/td><td style=\"padding:12px;border:1px solid #ddd\">Actual device variant, supply requirements and operating duty<\/td><td style=\"padding:12px;border:1px solid #ddd\">Can each required action be supported in the specified operating states?<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Protection and control electronics<\/td><td style=\"padding:12px;border:1px solid #ddd\">Supply range, demand and behavior on loss or restoration<\/td><td style=\"padding:12px;border:1px solid #ddd\">Will essential protection and indications behave as the owner requires?<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Auxiliary distribution<\/td><td style=\"padding:12px;border:1px solid #ddd\">Sources, circuit allocation, protective devices and identifiers<\/td><td style=\"padding:12px;border:1px solid #ddd\">Are responsibilities and affected functions clear for each supply failure?<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Remote interfaces<\/td><td style=\"padding:12px;border:1px solid #ddd\">Signal type, contact duties and interface drawings<\/td><td style=\"padding:12px;border:1px solid #ddd\">Do the switchgear and external systems agree electrically and functionally?<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">\u0627\u0644\u0645\u0631\u0627\u0642\u0628\u0629<\/td><td style=\"padding:12px;border:1px solid #ddd\">Defined alarms, destinations and response ownership<\/td><td style=\"padding:12px;border:1px solid #ddd\">Will a supply problem be detected and acted on?<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Verification and handover<\/td><td style=\"padding:12px;border:1px solid #ddd\">Approved checks, final drawings and settings records<\/td><td style=\"padding:12px;border:1px solid #ddd\">Can the delivered arrangement be identified and maintained correctly?<\/td><\/tr>\n<\/tbody><\/table><\/div>\n<figure><img decoding=\"async\" alt=\"KYN61-40.5 Armouring Removable AC Metal Enclosed Switchgear exterior panel reference view\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-control-voltage-guide-body2-20261017.png\" style=\"max-width:100%;height:auto\"\/><figcaption>Exterior product-reference illustration for auxiliary-interface planning. No control-circuit wiring or confirmed coil voltage is depicted.<\/figcaption><\/figure><h2>Evaluate voltage drop for the actual circuit<\/h2>\n<p>Circuit resistance can reduce the voltage available at a load while it operates. Assess the path using the project\u2019s conductor lengths and sizes, terminal and contact arrangements, source condition and device demand. For a simple steady DC approximation, voltage drop equals current multiplied by total circuit resistance. This arithmetic relationship alone is not a complete operating-coil or battery-system design method.<\/p>\n<p>For example, a hypothetical 2 ampere current through a 1 ohm complete path produces a 2 volt drop. Those numbers are purely illustrative and specify neither a real coil nor an acceptable margin. Dynamic behavior, contact performance and source variation may require a more detailed assessment. The designer must compare the resulting terminal conditions with the actual equipment requirements and retain the supporting assumptions.<\/p>\n<h2>Define what supply loss means for the installation<\/h2>\n<p>Ask what becomes unavailable when each auxiliary source or branch circuit is lost. The answer can involve protection availability, remote control, mechanism operation, indications or communications, depending on the design. Document the intended response and the operating restriction that applies. A shared supply can create common consequences even when the main power circuits remain energized.<\/p>\n<p>The project should also define restoration behavior. Automatic recovery of an electronic supply does not necessarily mean that all operating functions should resume without review. Identify alarms, required checks and any relevant owner-approved operating controls. Do not invent a universal fail-safe state for all switchgear; the correct behavior depends on the equipment construction, protection philosophy and application.<\/p>\n<h2>Coordinate remote commands and dry contacts<\/h2>\n<p>Remote systems may provide contacts, digital communications or other defined interfaces. A contact that changes state does not by itself establish the voltage and current it is suitable to switch. Agree the signal source, receiving circuit, contact duty and isolation requirements through the interface documentation. Confirm which party supplies the voltage and which party owns the protective device and cable.<\/p>\n<p>This is particularly important when a building management system, plant control system or substation control system connects to the switchgear. A functional request such as \u201cremote open\u201d should be translated into an approved interface description by the responsible designers. Keep communications commands distinct from hardwired operating circuits and from safety-related isolation. An interface table cannot replace an approved schematic and verification plan.<\/p>\n<figure><img decoding=\"async\" alt=\"KYN61-40.5 Armouring Removable AC Metal Enclosed Switchgear assembly in planned clean environment\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-control-voltage-guide-body3-20261017.png\" style=\"max-width:100%;height:auto\"\/><figcaption>Exterior product-reference illustration for auxiliary-interface planning. No control-circuit wiring or confirmed coil voltage is depicted.<\/figcaption><\/figure><h2>Keep unrelated auxiliary loads visible<\/h2>\n<p>Heaters, fans, lighting and service outlets may use supplies with different availability and isolation requirements from protection or operating circuits. Identify these loads instead of hiding them under one control-power total. Their loss may have a different immediate effect, but environmental control can still matter to the assembly\u2019s long-term service conditions and maintenance responsibilities.<\/p>\n<p>The cabinet\u2019s exterior cannot reveal the actual auxiliary arrangement. For the KYN61 family illustrated here, obtain the ordered configuration\u2019s schematic and device data rather than inferring a heater, battery or control transformer from a generated image. The illustrations are for equipment identification only. The supplier\u2019s current offer must confirm which components and functions are included and which interfaces remain the site contractor\u2019s responsibility.<\/p>\n<h2>Plan verification around the approved design<\/h2>\n<p>Verification should confirm the actual device variants, supply identification, circuit relationships and intended behavior through an approved inspection and test plan. Determine which checks can be performed in the factory and which require completed site interfaces. Record responsibilities, prerequisites, acceptance criteria and how deviations will be resolved before energization or operational handover.<\/p>\n<p>Electrical testing and operating checks must be performed by competent personnel using the applicable work procedures and manufacturer instructions. In the United States, 29 CFR 1910.333 provides relevant requirements for electrical work practices, subject to the workplace and task. This article does not authorize energized troubleshooting or give a switching sequence. Other jurisdictions and installations require their own applicable requirements and engineering review.<\/p>\n<h2>Control substitutions and spare-part identification<\/h2>\n<p>A replacement operating coil or electronic device needs the correct electrical variant as well as mechanical compatibility. Retain part numbers, device ratings, circuit identifiers and relevant firmware or configuration information where applicable. Procurement should require the supplier to identify substitutions and explain their effect on the auxiliary-load schedule and interface assessment before approval.<\/p>\n<p>For spares, store the technical identification with the asset record so technicians do not depend on a faded label or memory of an earlier order. If a source, cable route or operating philosophy changes, revisit the assessment rather than treating control voltage as a permanent one-line property. Good records reduce the chance that an apparently minor replacement creates a wider functional problem.<\/p>\n<h2>Build a complete RFQ and handover package<\/h2>\n<p>State the available auxiliary sources, required operating states, essential functions and external interfaces. Request device-specific supply data, a load schedule, schematic drawings, source-loss behavior, monitoring details and the agreed verification scope. Identify unresolved choices clearly so bidders price the same responsibility boundary. Applicable IEC 62271 documents provide part of the technical framework for high-voltage AC switchgear; catalogue pages establish scope rather than proving an individual offer\u2019s compliance.<\/p>\n<p>At handover, retain the approved and as-built versions, accepted deviations and verification records. Link them to the actual equipment identifiers and responsible maintenance team. The practical result is a control-supply specification that can be checked and maintained. It avoids guessing from the main voltage rating and gives future extension or replacement work a reliable starting point.<\/p>\n<h2>\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-20261017-3-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Is switchgear control voltage the same as its main voltage rating?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. The main rating concerns the power circuit, while control and auxiliary functions have their own supplies and device requirements. One assembly can contain several relevant supply voltages.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261017-3-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Should all switchgear use DC control power?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The choice depends on the equipment, available sources and required operating behavior. Evaluate the complete auxiliary system and credible supply-loss conditions rather than relying on the AC or DC label alone.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261017-3-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Where should operating voltage be assessed?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Assess the relevant device terminals under the specified operating demand and source conditions. The source-panel value alone does not account for the complete circuit path.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261017-3-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Can a dry contact directly operate any trip coil?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. The interface must satisfy the actual electrical duty, circuit and device requirements. Agree the source, receiving circuit, contact capability and responsibilities through the approved design.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261017-3-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should the buyer include in the RFQ?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Include available sources, essential functions, operating states, device-specific requirements, auxiliary loads, monitoring, remote interfaces, verification scope and the required as-built handover records.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div><h2>\u0627\u0644\u0645\u0635\u0627\u062f\u0631 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0648\u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0630\u0627\u062a \u0627\u0644\u0635\u0644\u0629<\/h2><p>\u062a\u0642\u0648\u0645 \u0635\u0641\u062d\u0627\u062a \u0627\u0644\u0643\u062a\u0627\u0644\u0648\u062c \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0628\u0648\u0636\u0639 \u0646\u0637\u0627\u0642 \u0627\u0644\u0648\u062b\u064a\u0642\u0629\u061b \u0648\u064a\u0642\u062a\u0636\u064a \u0627\u0644\u0627\u0645\u062a\u062b\u0627\u0644 \u0648\u0627\u0644\u0642\u0628\u0648\u0644 \u0627\u0633\u062a\u0639\u0631\u0627\u0636 \u0627\u0644\u0648\u062b\u0627\u0626\u0642 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0627\u0644\u0645\u0639\u0645\u0648\u0644 \u0628\u0647\u0627 \u0648\u0645\u0631\u0627\u062c\u0639\u0629 \u0647\u0646\u062f\u0633\u0629 \u0627\u0644\u0645\u0634\u0631\u0648\u0639.<\/p><ul><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/71439\" rel=\"noopener nofollow\" target=\"_blank\">IEC 62271-1:2017 with Amendment 1:2021 common specifications scope<\/a><\/li><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/96236\" rel=\"noopener nofollow\" target=\"_blank\">IEC 62271-200 assembly scope<\/a><\/li><li><a href=\"https:\/\/www.hse.gov.uk\/pubns\/books\/hsg85.htm\" rel=\"noopener nofollow\" target=\"_blank\">UK HSE HSG85: Electricity at work, safe working practices<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/ar\/product\/kyn61-40-5-armouring-removable-ac-metal-enclosed-switchgear\/\" rel=\"noopener\">LBAJI KYN61-40.5 \u0645\u0639\u062f\u0627\u062a \u0627\u0644\u062a\u062c\u0647\u064a\u0632 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a \u0627\u0644\u0642\u0627\u0628\u0644\u0629 \u0644\u0644\u0625\u0632\u0627\u0644\u0629 \u0645\u0639 \u0627\u0644\u0645\u0643\u0648\u0646\u0627\u062a \u0627\u0644\u0645\u0639\u062f\u0646\u064a\u0629<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/ar\/blog\/complete-guide-to-switchgear-fundamentals-comparisons\/\" rel=\"noopener\">\u0623\u0633\u0627\u0633\u064a\u0627\u062a \u0645\u0639\u062f\u0627\u062a \u0627\u0644\u062a\u0628\u062f\u064a\u0644<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/ar\/blog\/switchgear-testing-testing-guide\/\" rel=\"noopener\">\u062a\u062d\u0642\u0642 \u0648\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/ar\/blog\/switchgear-maintenance-checklist-maintenance-guide\/\" rel=\"noopener\">\u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0635\u064a\u0627\u0646\u0629 \u0623\u062c\u0647\u0632\u0629 \u0627\u0644\u062a\u062d\u0643\u0645<\/a><\/li><\/ul><h2>\u0627\u0644\u062a\u0639\u0644\u0645 \u0627\u0644\u0625\u0636\u0627\u0641\u064a: \u0627\u0644\u062e\u0644\u0641\u064a\u0629 \u0627\u0644\u0641\u0646\u064a\u0629<\/h2><p>\u064a\u062a\u0646\u0627\u0648\u0644 \u0647\u0630\u0627 \u0627\u0644\u0641\u064a\u062f\u064a\u0648 \u0627\u0644\u062a\u0639\u0644\u064a\u0645\u064a \u0627\u0644\u0645\u0633\u062a\u0642\u0644 \u0645\u0628\u0627\u062f\u0626 \u0627\u0644\u0642\u064a\u0627\u0633 \u0623\u0648 \u062e\u0644\u0641\u064a\u0629 \u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0645\u0630\u0643\u0648\u0631\u0629 \u0623\u0639\u0644\u0627\u0647. \u0648\u0644\u0643\u0646\u0647 \u0644\u0627 \u064a\u0648\u0636\u062d \u0625\u062c\u0631\u0627\u0621\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0622\u0645\u0646\u0629 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0627\u0644\u062a\u0631\u0643\u064a\u0628 \u0627\u0644\u0645\u062d\u062f\u062f. \u0627\u0644\u0645\u0635\u062f\u0631: \u063a\u0627\u0648\u0631\u0627\u0641 \u062c \u2013 TheElectricalGuy.<\/p><div data-video-title=\"Switchgear Basics: Complete Beginner&#x27;s Guide | TheElectricalGuy\" onclick=\"var w=this;setTimeout(function(){var f=w.querySelector(&quot;iframe&quot;);if(f){f.title=w.getAttribute(&quot;data-video-title&quot;);f.loading=&quot;lazy&quot;;}},100);\" style=\"position:relative;width:100%;padding-top:56.25%\"><iframe src=\"https:\/\/www.youtube-nocookie.com\/embed\/1eLEa9uqE3k\" title=\"\u0623\u0633\u0627\u0633\u064a\u0627\u062a \u0627\u0644\u0623\u062c\u0647\u0632\u0629 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629: \u062f\u0644\u064a\u0644 \u0627\u0644\u0645\u0628\u062a\u062f\u0626\u064a\u0646 \u0627\u0644\u0634\u0627\u0645\u0644 | TheElectricalGuy\" loading=\"lazy\" allowfullscreen style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0\"><\/iframe><\/div><p><a href=\"https:\/\/www.youtube.com\/watch?v=1eLEa9uqE3k\" rel=\"noopener nofollow\" target=\"_blank\">\u0634\u0627\u0647\u062f \u0623\u0633\u0627\u0633\u064a\u0627\u062a \u0627\u0644\u062a\u0628\u062f\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a: \u062f\u0644\u064a\u0644 \u0627\u0644\u0645\u0628\u062a\u062f\u0626\u064a\u0646 \u0627\u0644\u0634\u0627\u0645\u0644 | TheElectricalGuy<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Switchgear control voltage is the specified electrical supply used by auxiliary and control functions, such as operating coils, mechanisms, relays and indications. It is different from the main-circuit voltage carried by<\/p>","protected":false},"author":6,"featured_media":4570,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[58],"tags":[83,88,75],"class_list":["post-4575","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-engineering-guides","tag-power-distribution","tag-procurement-rfq","tag-switchgear"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts\/4575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/comments?post=4575"}],"version-history":[{"count":2,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts\/4575\/revisions"}],"predecessor-version":[{"id":4774,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/posts\/4575\/revisions\/4774"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/media\/4570"}],"wp:attachment":[{"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/media?parent=4575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/categories?post=4575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lbajiele.com\/ar\/wp-json\/wp\/v2\/tags?post=4575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}