{"id":2722,"date":"2026-08-22T14:27:00","date_gmt":"2026-08-22T14:27:00","guid":{"rendered":"https:\/\/lbajiele.com\/?p=2722"},"modified":"2026-10-23T00:44:33","modified_gmt":"2026-10-23T00:44:33","slug":"75-kva-transformer-amps-guide","status":"publish","type":"post","link":"https:\/\/lbajiele.com\/de\/blog\/75-kva-transformer-amps-guide\/","title":{"rendered":"75 kVA Transformator Ampere: Leitfaden f\u00fcr Prim\u00e4r- und Sekund\u00e4rstrom"},"content":{"rendered":"<p><strong>Ein 75-kVA-Transformator hat keinen festen Ampere-Nennwert.<\/strong> Current depends on phase and voltage: single-phase current is 75,000 \u00f7 V; three-phase line current is 75,000 \u00f7 (1.732 \u00d7 V). For example, 75 kVA is about 90.2 A at 480 V three-phase and 208.2 A at 208 V three-phase.<\/p>\n<div class=\"lbaji-key-takeaways\">\n<h2>Die wichtigsten Erkenntnisse<\/h2>\n<ul>\n<li>At 75 kVA, full-load amps depend on phase and the voltage at the side being measured.<\/li>\n<li>At 480 V three phase the result is 90.2 A; at 208 V three phase it is 208.2 A.<\/li>\n<li>These are winding current calculations, not automatic breaker, cable, or safe continuous-load ratings.<\/li>\n<\/ul>\n<\/div>\n<h2>75 kVA Stromformel<\/h2>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" alt=\"Three-phase transformer and switchboard used for full-load current calculations\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/08\/three-phase-kva-to-amps.png\"\/><figcaption>Dreiphasentransformator und Schaltanlage, die f\u00fcr Volllaststromberechnungen verwendet werden.<\/figcaption><\/figure>\n<p>F\u00fcr einphasigen Strom gilt: I = kVA \u00d7 1.000 \u00f7 V. F\u00fcr dreiphasigen Strom gilt: I = kVA \u00d7 1.000 \u00f7 (\u221a3 \u00d7 verkettete Spannung). Verwenden Sie die auf dem Typenschild angegebene Spannung anstelle eines Nennwerts. Diese Gleichungen beschreiben den Vollast-Scheinstrom; die Dimensionierung von Leitern und Schutzeinrichtungen richtet sich dennoch nach dem geltenden Regelwerk, der Belastung, der Temperatur und der Verlegeart.<\/p>\n<section class=\"lbaji-article-table\">\n<h2>Schnellvergleichs- und Auswahltabelle<\/h2>\n<p>Verwenden Sie diese Tabelle als kurze Zusammenfassung der wichtigsten im Artikel erkl\u00e4rten Ingenieur- und Beschaffungsentscheidungen.<\/p>\n<figure class=\"wp-block-table is-style-stripes\" style=\"overflow-x:auto;max-width:100%\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">Entscheidungsbereich<\/th>\n<th scope=\"col\">Praktische Bedeutung<\/th>\n<th scope=\"col\">Was zu \u00fcberpr\u00fcfen ist<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>75 kVA Stromformel<\/td>\n<td>F\u00fcr einphasigen Strom gilt: I = kVA \u00d7 1.000 \u00f7 V.<\/td>\n<td>F\u00fcr Drehstrom gilt: I = kVA \u00d7 1.000 \u00f7 (\u221a3 \u00d7 verkettete Spannung).<\/td>\n<\/tr>\n<tr>\n<td>\u00dcbliche Vollaststr\u00f6me f\u00fcr 75 kVA<\/td>\n<td>Bei 240 V einphasig betr\u00e4gt der berechnete Strom 312,5 A, und bei 480 V einphasig betr\u00e4gt er 156,3 A.<\/td>\n<td>For three phase, common results are 90.2 A at 480 V, 104.3 A at 415 V, 108.3 A at 400 V, 208.2 A at 208 V and 180.4 A at 240 V.<\/td>\n<\/tr>\n<tr>\n<td>Prim\u00e4r- und Sekund\u00e4rverst\u00e4rker<\/td>\n<td>Eine dreiphasige 480-zu-208Y\/120-V-Einheit f\u00fchrt bei 75 kVA etwa 90 A auf der 480-V-Seite und 208 A auf der 208-V-Seite.<\/td>\n<td>Der Transformator ver\u00e4ndert das Spannungs-Strom-Verh\u00e4ltnis, w\u00e4hrend die Scheinwerferleistung unter Ausschluss von Verlusten n\u00e4herungsweise konstant bleibt.<\/td>\n<\/tr>\n<tr>\n<td>Bemessung von Schutzschaltern und Leitungen<\/td>\n<td>W\u00e4hlen Sie Schutzschalter nicht allein anhand der Volllaststromst\u00e4rke aus.<\/td>\n<td>Vorschriften erlauben oder verlangen spezifische Schutzanordnungen f\u00fcr den Prim\u00e4rschutz allein oder f\u00fcr den Prim\u00e4r- und Sekund\u00e4rschutz und ber\u00fccksichtigen den Einschaltstrom.<\/td>\n<\/tr>\n<tr>\n<td>Ist 75 kVA gro\u00df genug?<\/td>\n<td>Addieren Sie die Last in kVA, anstatt einfach Ampere \u00fcber verschiedene Spannungen hinweg zu addieren.<\/td>\n<td>Ber\u00fccksichtigen Sie den Bedarf, das Motoranlassen, nichtlineare Oberschwingungen, zuk\u00fcnftige Erweiterungen, die Umgebungstemperatur und die zul\u00e4ssige Spannungsregelung.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<\/section>\n<h2>\u00dcbliche Vollaststr\u00f6me f\u00fcr 75 kVA<\/h2>\n<p>At 240 V single phase the calculated current is 312.5 A, and at 480 V single phase it is 156.3 A. For three phase, common results are 90.2 A at 480 V, 104.3 A at 415 V, 108.3 A at 400 V, 208.2 A at 208 V and 180.4 A at 240 V. Rounding should not be used to conceal a voltage mismatch.<\/p>\n<h2>Prim\u00e4r- und Sekund\u00e4rverst\u00e4rker<\/h2>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" alt=\"Coordinated transformer primary and secondary protection\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/08\/transformer-breaker-fuse-sizing.png\"\/><figcaption>Koordinierter Transformatorprim\u00e4r- und -sekund\u00e4rschutz.<\/figcaption><\/figure>\n<p>Ein dreiphasiger 480-zu-208Y\/120-V-Transformator f\u00fchrt bei 75 kVA auf der 480-V-Seite etwa 90 A und auf der 208-V-Seite etwa 208 A. Der Transformator ver\u00e4ndert das Spannungs-Strom-Verh\u00e4ltnis, w\u00e4hrend die Scheinleistung abz\u00fcglich der Verluste nahezu konstant bleibt. Prim\u00e4r- und Sekund\u00e4rleiter ben\u00f6tigen daher unterschiedliche Strombelastbarkeiten und Absicherungen.<\/p>\n<h2>Bemessung von Schutzschaltern und Leitungen<\/h2>\n<p>W\u00e4hlen Sie Schutzschalter nicht allein anhand des Volllaststroms aus. Vorschriften erlauben oder erfordern spezifische Schutzanordnungen nur f\u00fcr die Prim\u00e4rseite oder f\u00fcr die Prim\u00e4r- und Sekund\u00e4rseite und ber\u00fccksichtigen den Einschaltstrom. Leiter m\u00fcssen auf Dauerbelastung, Isolationstemperatur, Anschlussbemessungswerte, Umgebungstemperaturkorrektur, B\u00fcndelung und Spannungsabfall \u00fcberpr\u00fcft werden. Ein qualifizierter Planer sollte vorgelagerte und nachgelagerte Ger\u00e4te aufeinander abstimmen.<\/p>\n<h2>Ist 75 kVA gro\u00df genug?<\/h2>\n<p>Addieren Sie die Scheinleistung in kVA, anstatt einfach Amperezahlwerte bei unterschiedlichen Spannungen zu summieren. Ber\u00fccksichtigen Sie den tats\u00e4chlichen Bedarf, den Motoranlauf, nichtlineare Oberschwingungen, zuk\u00fcnftige Erweiterungen, die Umgebungstemperatur und die zul\u00e4ssige Spannungsregelung. Ein Aggregat, das f\u00fcr eine gleichm\u00e4\u00dfige Last ausreicht, kann beim Motorhochlauf einen \u00fcberm\u00e4\u00dfigen Spannungseinbruch verursachen oder durch oberschwingungsreiche Str\u00f6me hei\u00df laufen.<\/p>\n<h2>Typenschild- und Beschaffungspr\u00fcfungen<\/h2>\n<p>Best\u00e4tigen Sie Prim\u00e4r- und Sekund\u00e4rspannung, Phase, Frequenz, Vektor- oder Wicklungsverbindung, Anzapfungen, Impedanz, Isolationsklasse, Temperaturanstieg, Geh\u00e4use, Wirkungsgrad, Schall und Zubeh\u00f6r. \u00dcberpr\u00fcfen Sie bei Nachr\u00fcstungen vor der Bestellung die Aufstellfl\u00e4che, Kabeleinf\u00fchrung, den Klemmenanschluss, den verf\u00fcgbaren Fehlerstrom und den vorgelagerten Schutz.<\/p>\n<section class=\"lbaji-gsc-update\">\n<h2>75 kVA Full-Load Amps by Voltage and Phase<\/h2>\n<p>The table below uses a 75,000 VA nameplate rating. For three-phase rows, voltage means line-to-line voltage and current means line current. Single-phase rows use the voltage across the winding. Values are rounded to one decimal ampere; the design calculation should use the actual nameplate voltage and the project electrical drawings.<\/p>\n<figure class=\"wp-block-table is-style-stripes\" style=\"overflow-x:auto;max-width:100%\">\n<table>\n<thead>\n<tr>\n<th scope=\"col\">System voltage<\/th>\n<th scope=\"col\">Single-phase full-load current<\/th>\n<th scope=\"col\">Three-phase full-load line current<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>208 V<\/td>\n<td>360.6 A<\/td>\n<td>208.2 A<\/td>\n<\/tr>\n<tr>\n<td>230 V<\/td>\n<td>326.1 A<\/td>\n<td>188.3 A<\/td>\n<\/tr>\n<tr>\n<td>240 V<\/td>\n<td>312,5 A<\/td>\n<td>180.4 A<\/td>\n<\/tr>\n<tr>\n<td>400 V<\/td>\n<td>187,5 A<\/td>\n<td>108.3 A<\/td>\n<\/tr>\n<tr>\n<td>415 V<\/td>\n<td>180.7 A<\/td>\n<td>104.3 A<\/td>\n<\/tr>\n<tr>\n<td>480 V<\/td>\n<td>156.3 A<\/td>\n<td>90,2 A<\/td>\n<\/tr>\n<tr>\n<td>600 V<\/td>\n<td>125,0 A<\/td>\n<td>72.2 A<\/td>\n<\/tr>\n<\/tbody>\n<\/table><figcaption>Calculated from I = 75,000\/V for single phase and I = 75,000\/(\u221a3 \u00d7 V) for balanced three phase. Formula basis: <a href=\"https:\/\/www.se.com\/us\/en\/faqs\/FA101694\/\" target=\"_blank\" rel=\"noopener nofollow\">Schneider Electric transformer capacity FAQ<\/a> und der <a href=\"https:\/\/www.electrical-installation.org\/enwiki\/Choice_of_transformer_rating\" target=\"_blank\" rel=\"noopener nofollow\">Electrical Installation Guide<\/a>.<\/figcaption><\/figure>\n<p>This table is a current lookup, not a promise that every 75 kVA transformer is available in every listed voltage or connection. Confirm the actual primary and secondary nameplate ratings, winding connection, frequency, taps and cooling designation. Never use a 400 V row for a 480 V winding simply because both are described as industrial three-phase systems.<\/p>\n<h2>Worked Example: 480 V Primary to 208Y\/120 V Secondary<\/h2>\n<p>Consider a balanced 75 kVA, three-phase step-down transformer with a 480 V line-to-line primary and a 208Y\/120 V secondary. On the primary, the theoretical full-load line current is 75,000 \u00f7 (\u221a3 \u00d7 480) = 90.2 A. On the secondary, it is 75,000 \u00f7 (\u221a3 \u00d7 208) = 208.2 A. The 120 V marking identifies line-to-neutral voltage on the wye secondary. For the three-phase calculation, use 208 V line-to-line, not 120 V.<\/p>\n<p>The higher secondary current is expected: voltage falls while apparent power remains approximately the same, allowing for real transformer losses. When reviewing a one-line diagram, calculate each side separately. Check the transformer nameplate before ordering a breaker or cable; current alone does not establish conductor ampacity, breaker setting or short-circuit duty.<\/p>\n<h2>How Many kW Can a 75 kVA Transformer Supply?<\/h2>\n<p>kVA measures apparent power; kW measures real power. For a balanced load, estimated real power is kW = 75 \u00d7 power factor. At 0.8 power factor, that is 60 kW. At 0.9 power factor, it is 67.5 kW. At unity power factor, the mathematical maximum is 75 kW. These figures do not replace a load study: harmonics, motor starting, duty cycle, ambient temperature and the transformer&#8217;s actual thermal rating still matter.<\/p>\n<p>Do not apply an automatic \u201c80% of 75 kVA\u201d rule to every transformer. A continuous-load rule for a particular protective device or installation is not the same as the transformer&#8217;s nameplate thermal capacity. Ask the electrical designer to document the applicable code, manufacturer instructions, load profile and required spare capacity.<\/p>\n<h2>When 75 kVA Is Too Small<\/h2>\n<p>Compare the highest expected coincident demand in kVA with the transformer&#8217;s rating under the actual operating conditions. If several loads start at different times, a simple sum of every nameplate rating may overstate demand. If large motors start together, steady-state current can understate the short-duration voltage dip. Record both cases rather than treating a single amperage number as the entire sizing decision.<\/p>\n<p>For example, a balanced 480 V three-phase load drawing 100 A represents approximately \u221a3 \u00d7 480 \u00d7 100 \u00f7 1,000 = 83.1 kVA before any allowance for expansion. That exceeds 75 kVA. Conversely, a 60 A load at the same voltage represents about 49.9 kVA, leaving apparent-power headroom, subject to starting current, thermal conditions and other connected loads. Schneider Electric&#8217;s <a href=\"https:\/\/www.se.com\/us\/en\/faqs\/FA101694\/\" target=\"_blank\" rel=\"noopener nofollow\">capacity guidance<\/a> explicitly notes that motor and specialty loads may require more than the simple arithmetic result.<\/p>\n<h2>What to Send With a 75 kVA Transformer Inquiry<\/h2>\n<p>Give the supplier the primary and secondary voltage, phase, frequency, connection, installation site, required enclosure, ambient conditions and available fault current. Include the load schedule, motor-starting information, harmonic-producing equipment and space limits. Ask for a data sheet showing nameplate ratings, impedance, losses, temperature rise, dimensions and routine test documents. If replacing a unit, provide photos of the existing nameplate and terminal layout, not only the phrase \u201c75 kVA transformer.\u201d<\/p>\n<p>For adjacent calculations, use our <a href=\"https:\/\/lbajiele.com\/de\/blog\/how-much-load-can-a-63-kva-transformer-handle\/\">63 kVA load-capacity example<\/a>, <a href=\"https:\/\/lbajiele.com\/de\/blog\/amps-convert-to-kva-calculator-and-formula-guide\/\">amps-to-kVA formula guide<\/a> und <a href=\"https:\/\/lbajiele.com\/de\/blog\/transformatorsicherungs-handbuch\/\">Transformatorsicherungs-Handbuch<\/a>. Review the <a href=\"https:\/\/lbajiele.com\/de\/produktkategorie\/transformer\/\">Transformatorensortiment<\/a> for available configurations; confirm project-specific values with the manufacturer.<\/p>\n<h2>Three-Phase Transformer Video Lesson<\/h2>\n<p>For the relationship between phase voltage, line voltage and transformer connections, this NPTEL university lecture provides a useful technical introduction. The calculation table above remains the direct answer for 75 kVA current.<\/p>\n<div class=\"lbaji-video\" style=\"position:relative;padding-bottom:56.25%;height:0;overflow:hidden\"><iframe src=\"https:\/\/www.youtube-nocookie.com\/embed\/s86tXyDQIxg\" title=\"NPTEL Introduction to Three Phase Transformer\" loading=\"lazy\" allow=\"accelerometer; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0\"><\/iframe><\/div>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=s86tXyDQIxg\" target=\"_blank\" rel=\"noopener nofollow\">Watch NPTEL&#8217;s Introduction to Three Phase Transformer on YouTube<\/a>.<\/p>\n<\/section>\n<h2>Zugeh\u00f6rige LBAJI-Ausr\u00fcstung<\/h2>\n<p>\u00dcberpr\u00fcfen Sie das Relevante <a href=\"https:\/\/lbajiele.com\/de\/produktkategorie\/transformer\/\">LBAJI-Produktpalette<\/a> und die Unterst\u00fctzung <a href=\"https:\/\/lbajiele.com\/de\/blog\/complete-guide-to-transformer-capacity-size-dimensions\/\">Leitfaden zu Transformatorenleistung, -gr\u00f6\u00dfe und -abmessungen<\/a>. Senden Sie das einpolige Schaltdiagramm, die Nennwerte, die St\u00fcckzahl und die Umgebung f\u00fcr eine projektspezifische Konfiguration.<\/p>\n<section class=\"lbaji-visible-faq\" aria-label=\"H\u00e4ufig gestellte Fragen\">\n<h2>H\u00e4ufig gestellte Fragen<\/h2>\n<div class=\"rank-math-list-item\" id=\"faq-question-1\">\n<h3 class=\"rank-math-question\">How many amps is a 75 kVA transformer at 480 V three phase?<\/h3>\n<div class=\"rank-math-answer\">\n<p>Approximately 90.2 A at full load, calculated as 75,000 divided by 1.732 times 480.<\/p>\n<\/div>\n<\/div>\n<div class=\"rank-math-list-item\" id=\"faq-question-2\">\n<h3 class=\"rank-math-question\">How many amps is 75 kVA at 208 V three phase?<\/h3>\n<div class=\"rank-math-answer\">\n<p>Approximately 208.2 A at full load.<\/p>\n<\/div>\n<\/div>\n<div class=\"rank-math-list-item\" id=\"faq-question-3\">\n<h3 class=\"rank-math-question\">Is kVA the same as kW?<\/h3>\n<div class=\"rank-math-answer\">\n<p>No. kVA is apparent power; kW is real power and equals kVA multiplied by power factor for a balanced load.<\/p>\n<\/div>\n<\/div>\n<div class=\"rank-math-list-item\" id=\"faq-question-4\">\n<h3 class=\"rank-math-question\">Can I size the breaker exactly at full-load current?<\/h3>\n<div class=\"rank-math-answer\">\n<p>Not automatically. Transformer inrush and electrical-code protection rules must be applied.<\/p>\n<\/div>\n<\/div>\n<div class=\"rank-math-list-item\" id=\"faq-question-5\">\n<h3 class=\"rank-math-question\">Why are secondary amps higher than primary amps?<\/h3>\n<div class=\"rank-math-answer\">\n<p>A step-down transformer reduces voltage, so current rises for approximately the same apparent power.<\/p>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"lbaji-decision-aid\">\n<h2>Praktischer Evaluierungs-Workflow<\/h2>\n<p>Verwenden Sie f\u00fcr 75-kVA-Transformator-Ampere einen dokumentierten Arbeitsablauf anstelle einer rein katalogbasierten Auswahl. Fixieren Sie zun\u00e4chst die Systemeingaben und Betriebsgrenzen. Vergleichen Sie als N\u00e4chstes die verf\u00fcgbaren Konstruktions- oder Serviceoptionen mit der tats\u00e4chlichen Umgebung. \u00dcberpr\u00fcfen Sie dann Berechnungen, Schutzschnittstellen und Abnahmetests. Dokumentieren Sie schlie\u00dflich genehmigte Abweichungen und bewahren Sie die Baseline-Ergebnisse f\u00fcr die Inbetriebnahme und Wartung auf.<\/p>\n<ol>\n<li>\u00dcberpr\u00fcfen Sie die g\u00e4ngigen Vollaststr\u00f6me f\u00fcr 75 kVA und dokumentieren Sie die projektspezifische Entscheidung.<\/li>\n<li>\u00dcberpr\u00fcfen Sie Prim\u00e4r- und Sekund\u00e4rverst\u00e4rker und protokollieren Sie die projektspezifische Entscheidung.<\/li>\n<li>\u00dcberpr\u00fcfen Sie die Bemessung von Schutzschaltern und Leitungen und dokumentieren Sie die projektspezifische Entscheidung.<\/li>\n<li>Pr\u00fcfen Sie, ob 75 kVA gro\u00df genug sind, und dokumentieren Sie die projektspezifische Entscheidung.<\/li>\n<\/ol>\n<\/section>\n<section class=\"lbaji-acceptance-records\">\n<h2>Aufzubewahrende Abnahmeprotokolle<\/h2>\n<p>Behalten Sie das genehmigte Datenblatt, die Zeichnungen, die Abweichungsliste, gegebenenfalls die Materialzertifikate, die Routine- und Sonderpr\u00fcfberichte, die Schutzeinstellungen, die Inbetriebnahmeanergebnisse, Fotografien und die finalen Typenschildangaben. Dokumentieren Sie die Pr\u00fcfbedingungen sowie die Werte, da Temperatur, Messmethode und Anschluss den Vergleich beeinflussen k\u00f6nnen. Diese Dokumente bilden die Ausgangsbasis f\u00fcr die Untersuchung sp\u00e4terer Alarme, Last\u00e4nderungen oder Verschlechterungen. Sie verhindern zudem, dass Ersatzger\u00e4te auf der Grundlage einer unvollst\u00e4ndigen Beschreibung bestellt werden, nachdem Personal oder Lieferanten gewechselt haben.<\/p>\n<\/section>\n<section class=\"lbaji-technical-references\">\n<h2>Technische Referenzen und Weiterf\u00fchrende Literatur<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.energy.gov\/cmei\/buildings\/distribution-transformers\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Ressourcen f\u00fcr US-DOE-Verteilungstransformatoren<\/a><\/li>\n<li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/588\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">IEC 60076-1 Leistungstransformatoren<\/a><\/li>\n<li><a href=\"https:\/\/www.nfpa.org\/codes-and-standards\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">NFPA-Elektrovorschriften und -normen<\/a><\/li>\n<\/ul>\n<\/section>\n<h2>Fazit<\/h2>\n<p>A 75 kVA transformer does not have one fixed amp rating. Current depends on phase and voltage: single-phase current is 75,000 \u00f7 V; three-phase line current is 75,000 \u00f7 (1.732 \u00d7 V). For example, 75 kVA is about 90.2 A at 480 V three-phase and 208.2 A at 208 V three-phase. Use project data and documented acceptance criteria before purchase, installation or service.<\/p>","protected":false},"excerpt":{"rendered":"<p>75 kVA transformer amps depend on voltage and phase. See single- and three-phase current charts, a 480-to-208 V example, and sizing checks.<\/p>","protected":false},"author":6,"featured_media":2721,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[52],"tags":[85,66,65],"class_list":["post-2722","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-transformers","tag-kva-calculations","tag-transformer-capacity","tag-transformer-sizing"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/posts\/2722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/comments?post=2722"}],"version-history":[{"count":6,"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/posts\/2722\/revisions"}],"predecessor-version":[{"id":4831,"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/posts\/2722\/revisions\/4831"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/media\/2721"}],"wp:attachment":[{"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/media?parent=2722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/categories?post=2722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lbajiele.com\/de\/wp-json\/wp\/v2\/tags?post=2722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}