{"id":2335,"date":"2026-08-09T15:00:00","date_gmt":"2026-08-09T07:00:00","guid":{"rendered":"https:\/\/lbajiele.com\/news\/250kva-oil-immersed-power-transformer-specifications-rfq-guide\/"},"modified":"2026-08-09T15:00:00","modified_gmt":"2026-08-09T07:00:00","slug":"250kva-oil-immersed-power-transformer-specifications-rfq-guide","status":"publish","type":"post","link":"https:\/\/lbajiele.com\/vi\/blog\/250kva-oil-immersed-power-transformer-specifications-rfq-guide\/","title":{"rendered":"M\u00e1y bi\u1ebfn \u00e1p \u0111i\u1ec7n ng\u00e2m d\u1ea7u 250KVA: Th\u00f4ng s\u1ed1 k\u1ef9 thu\u1eadt v\u00e0 H\u01b0\u1edbng d\u1eabn y\u00eau c\u1ea7u b\u00e1o gi\u00e1 (RFQ)"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\">A <strong>250KVA oil immersed power transformer<\/strong> RFQ is useful only when electrical, site and document requirements are defined on the same sheet. A kVA label without voltage, connection group, loss basis and installation conditions leaves suppliers free to quote different configurations.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Begin with the approved single-line diagram and load data. Then use catalog figures as a screening reference while reserving final decisions for the issued datasheet, GA drawing and agreed test documentation.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"250KVA oil immersed transformer product view for RFQ planning\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/06\/Oil-Immersed-distribution-Transformer.2.webp\" \/><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">Contents<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#part-1-define-the-250-kva-duty-before-requesting-prices\">Part 1. Define the 250 kVA duty before requesting prices<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-2-put-comparable-electrical-data-into-every-quotation\">Part 2. Put comparable electrical data into every quotation<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-3-read-losses-vector-group-and-impedance-in-context\">Part 3. Read losses, vector group and impedance in context<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-4-bring-site-foundation-and-environmental-inputs-into-the-review\">Part 4. Bring site foundation and environmental inputs into the review<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-5-request-documents-that-support-a-purchase-decision\">Part 5. Request documents that support a purchase decision<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-6-use-the-lbaji-oil-immersed-series-as-a-review-starting-point\">Part 6. Use the LBAJI oil-immersed series as a review starting point<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-7-avoid-procurement-mistakes-that-hide-configuration-differences\">Part 7. Avoid procurement mistakes that hide configuration differences<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-1-define-the-250-kva-duty-before-requesting-prices\">Part 1. Define the 250 kVA duty before requesting prices<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The first decision is the duty at the connection point, not the product name. State the primary and secondary voltage, frequency, expected loading, grounding philosophy, downstream protection context and future load changes that could affect the selection.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">At this capacity, the project team should also agree whether the request concerns a distribution duty, an equipment replacement or a new feeder. Those contexts can require different drawings, cable interfaces and site information.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">The <a href=\"https:\/\/lbajiele.com\/vi\/transformer\/\">Transformer category<\/a> provides the product-line overview. For wider capacity comparison, see the <a href=\"https:\/\/lbajiele.com\/vi\/blog\/500kva-oil-immersed-specifications-selection-guide\/\">500KVA oil-immersed selection guide<\/a> v\u00e0 <a href=\"https:\/\/lbajiele.com\/vi\/blog\/oil-immersed-conservator-vs-sealed-tank-selection-guide\/\">oil-immersed conservator versus sealed tank guide<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-2-put-comparable-electrical-data-into-every-quotation\">Part 2. Put comparable electrical data into every quotation<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">LBAJI publishes an S11-M-250 row on its <a href=\"https:\/\/lbajiele.com\/vi\/san-pham\/s-m-oil-immersed-power-transformer\/\">S\u25a1-M oil-immersed power transformer series<\/a> page. It is a catalog reference, so use it to prepare the technical comparison sheet rather than to assume a final project configuration.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">M\u1ee5c<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Published reference or decision<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Why it matters<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Send with quote<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Rated capacity<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">250 kVA<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Establishes the duty basis<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">load schedule<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Voltage combination<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">6\u201311 kV \/ 0.4 kV options are published<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Defines system connection<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">approved primary and secondary voltage<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Connection group<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Dyn11 or Yyn0 options are published<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Affects grounding and loss comparison<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">required vector group<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tap range<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00b15% or \u00b12 \u00d7 2.5% options are published<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Supports voltage planning<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">tap requirement<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">No-load loss<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">400 W for S11-M-250<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Supports lifecycle comparison<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">loss basis and tolerance<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Load loss<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">3200\/3050 W by published connection-group basis<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Must be normalized across bids<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">connection group and reference basis<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Impedance<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">4.0% catalog reference<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Relates to protection coordination<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">project impedance target<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Dimensions and weight<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">1200 \u00d7 800 \u00d7 1190 mm; 955 kg<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Supports civil planning<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">issued GA drawing request<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">Every bid should identify its voltage, vector group and loss basis in the same table. If any one of these differs, the quoted transformer may not be technically comparable even when both are labelled 250 kVA.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-3-read-losses-vector-group-and-impedance-in-context\">Part 3. Read losses, vector group and impedance in context<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">No-load loss is present while the transformer is energized; load loss varies with current and the stated reference condition. Both should be compared using identical assumptions, not copied from different catalog columns into a single cost estimate.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">The published S11-M table separates certain lower-capacity load-loss values by connection group. Keep the selected vector group visible in the quotation review, because it affects the interpretation of that row as well as the system grounding arrangement.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">A 4.0% catalog impedance reference is not an automatic fit for every protection study. Give the project target and available fault-level information to the responsible engineer before treating a catalog percentage as approved.<\/p>\n<blockquote>\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Important:<\/strong> A catalog loss, impedance or dimension figure does not demonstrate utility acceptance, site-code compliance or final protection coordination. The approved project documents and engineering review control those decisions. Source: IEEE C57.12.00.<\/p>\n<\/blockquote>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-4-bring-site-foundation-and-environmental-inputs-into-the-review\">Part 4. Bring site foundation and environmental inputs into the review<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Oil-immersed equipment needs an installation review that covers lifting access, transformer footprint, cable route, clearances, drainage or containment arrangements and local environmental conditions. A catalog size and weight can support early planning, but the issued GA drawing controls final foundation and handling decisions.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Oil immersed transformer installation for site and foundation review\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/06\/400KVA-oil-transformer.3.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\">Describe whether the location is indoor or outdoor, the ambient range, elevation, access route and any project requirements for oil management or fire separation. Do not infer a site code outcome from the cooling method alone.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-5-request-documents-that-support-a-purchase-decision\">Part 5. Request documents that support a purchase decision<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The RFQ should request evidence that directly connects the proposed transformer to the project inputs. This prevents a procurement decision from relying only on a short product description.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Document or input<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Why it is needed<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Timing<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Single-line diagram and voltage data<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Confirms electrical interface<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">RFQ issue<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Vector group, tap and impedance target<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Supports protection and grounding review<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">RFQ issue<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Loss schedule and comparison basis<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Allows like-for-like bid analysis<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">quotation review<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">GA drawing and foundation loads<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Supports layout, lifting and civil design<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">before order release<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Terminal and outgoing-connection drawing<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Coordinates cables or busbars<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">before fabrication review<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Routine-test documentation and agreed test scope<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Defines acceptance evidence<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">contract review<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">Include site conditions, desired nameplate language, shipping constraints and any witness-test request. If a requirement is not known, label it for confirmation rather than silently assuming a standard configuration.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-6-use-the-lbaji-oil-immersed-series-as-a-review-starting-point\">Part 6. Use the LBAJI oil-immersed series as a review starting point<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The <a href=\"https:\/\/lbajiele.com\/vi\/san-pham\/s-m-oil-immersed-power-transformer\/\">S\u25a1-M oil-immersed power transformer series<\/a> is the appropriate LBAJI catalog entry point for a 250 kVA oil-immersed review. Its published series data can help structure the request, while the final order should follow the confirmed model-specific documents.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Oil immersed transformer context for 250KVA procurement review\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/06\/3150-KVA-oil-transformer.webp\" \/><\/figure>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Better fit<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Needs additional engineering confirmation<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">A project with defined voltages, load profile and connection group<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">A purchase request based only on capacity and a product photograph<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Buyers able to compare loss data on a shared basis<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">A bid comparison that mixes unlike vector groups or loss columns<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">A site team that can provide layout and access constraints<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">An assumption that catalog dimensions finalize the foundation<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">S\u1eed d\u1ee5ng <a href=\"https:\/\/lbajiele.com\/vi\/contact-us\/\">Li\u00ean h\u1ec7 v\u1edbi ch\u00fang t\u00f4i<\/a> to submit the electrical and site inputs for a configuration-specific review.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-7-avoid-procurement-mistakes-that-hide-configuration-differences\">Part 7. Avoid procurement mistakes that hide configuration differences<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Comparing 250 kVA quotations without fixing the primary and secondary voltage.<\/li>\n<li style=\"margin:0 0 8px\">Omitting vector group and then comparing load-loss values that use different bases.<\/li>\n<li style=\"margin:0 0 8px\">Treating catalog impedance as a replacement for protection coordination.<\/li>\n<li style=\"margin:0 0 8px\">Releasing civil work from a reference size instead of an issued GA drawing.<\/li>\n<li style=\"margin:0 0 8px\">Requesting tests without identifying the required standard, documentation or witness scope.<\/li>\n<li style=\"margin:0 0 8px\">Stating utility acceptance, environmental compliance or a project delivery result without supporting evidence.<\/li>\n<\/ul>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"faq\">C\u00e2u h\u1ecfi th\u01b0\u1eddng g\u1eb7p<\/h2>\n<h3 style=\"margin:28px 0 12px\">What is a 250KVA oil immersed power transformer used for?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">It can be considered for a defined distribution duty when the project&#8217;s load, voltage and installation inputs fit that rating. The final application must be checked against the approved electrical and site design.<\/p>\n<h3 style=\"margin:28px 0 12px\">Which 250KVA transformer values should be compared on the same basis?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Compare voltage combination, vector group, tap range, no-load loss, load-loss reference basis, no-load current, impedance, dimensions, weight and the requested test-document scope. A capacity label alone does not make bids equivalent.<\/p>\n<h3 style=\"margin:28px 0 12px\">Is a 4% impedance value automatically correct for the project?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. A catalog impedance reference is a starting point. The project protection study, available fault level, grounding arrangement and downstream equipment must be reviewed before the final value is accepted.<\/p>\n<h3 style=\"margin:28px 0 12px\">What documents should be requested before a purchase order?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Request the approved datasheet, GA and foundation information, terminal arrangement, loss and impedance basis, nameplate details, routine-test documentation and any agreed witness-test scope. The contract may require additional project-specific documents.<\/p>\n<h3 style=\"margin:28px 0 12px\">Can a 250KVA oil immersed transformer be placed outdoors without further review?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Outdoor suitability depends on the ordered construction, environmental exposure, access, containment and applicable project requirements. Confirm those conditions rather than assuming that oil immersion alone answers the question.<\/p>\n<h3 style=\"margin:28px 0 12px\">Do catalog values control the final purchase order?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. Catalog values help screen options. The approved configuration, drawings and agreed documentation control the transformer that is ordered.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"references\">References<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/standard\/C57_12_00-2021.html\" rel=\"nofollow noopener\" target=\"_blank\">IEEE C57.12.00: Standard for liquid-immersed distribution transformers<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/5998\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60076-1: Power transformers \u2014 General<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A 250KVA oil immersed power transformer RFQ is useful only when electrical, site and document requirements are defined on the same sheet. A kVA label without voltage, connection group, loss basis and installation conditions leaves suppliers free to quote different configurations. Begin with the approved single-line diagram and load data. Then use catalog figures as [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":1739,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[31],"tags":[],"class_list":["post-2335","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/2335","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/comments?post=2335"}],"version-history":[{"count":0,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/2335\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/media\/1739"}],"wp:attachment":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/media?parent=2335"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/categories?post=2335"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/tags?post=2335"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}