{"id":4265,"date":"2026-10-15T07:00:00","date_gmt":"2026-10-15T07:00:00","guid":{"rendered":"https:\/\/lbajiele.com\/?p=4265"},"modified":"2026-10-15T12:01:47","modified_gmt":"2026-10-15T12:01:47","slug":"switchgear-nameplate-ratings-guide","status":"publish","type":"post","link":"https:\/\/lbajiele.com\/vi\/blog\/switchgear-nameplate-ratings-guide\/","title":{"rendered":"B\u1ea3ng ghi t\u00ean thi\u1ebft b\u1ecb \u0111i\u1ec7n t\u1eed: \u0110\u1ecdc d\u1eef li\u1ec7u l\u1eafp r\u00e1p"},"content":{"rendered":"<p>Switchgear nameplate ratings identify the declared characteristics of a particular assembly or device, but they must be read together with the equipment records and project conditions. The assembly rating is not automatically the rating of its largest breaker, and a current value alone does not establish suitability for a circuit. Review equipment identity, applicable assembly scope, voltage, frequency, current duties, short-circuit characteristics and service conditions as separate checks. When a label is unclear or missing, obtain supported documentation from the manufacturer rather than reconstructing a rating from cabinet size or appearance.<\/p>\n<h2>Establish whether the label belongs to the assembly<\/h2>\n<p>A switchgear lineup can contain an assembly identification plate, device labels, circuit references and operating notices. These labels serve different purposes. A breaker nameplate describes that device; a relay label identifies a protection or control component. Neither necessarily states the complete assembly&#8217;s verified characteristics. Begin by locating the equipment identification used in the manufacturer&#8217;s project records and determining what object each plate describes.<\/p>\n<p>Record the assembly designation, serial or project reference where provided, manufacturer identity and relevant drawing revision. These details allow the supplier to retrieve the correct configuration and supporting evidence. Do not assume that a catalogue family name fully describes the delivered equipment. Two visually similar assemblies can have different circuit arrangements, components and duties. A photograph is useful for communicating a question, but it should be accompanied by records that identify the actual installation and the label being discussed.<\/p>\n<h2>Keep low- and medium-voltage scopes distinct<\/h2>\n<p>The applicable assembly context affects how ratings are declared and verified. IEC 61439 addresses low-voltage assembly requirements, while IEC 62271-200 addresses metal-enclosed AC switchgear within its stated scope. These catalogue references help identify the relevant document family; they do not certify a particular LBAJI product or make different rating terms interchangeable. Use the edition and requirements applicable to the project and the offered equipment.<\/p>\n<p>If the procurement documents mix rating language from different equipment scopes, ask the engineer and supplier to resolve the ambiguity. A device may comply with its own product requirements while the assembly needs separate design and verification evidence. The final submittal should state which characteristics belong to the assembly, which belong to individual devices and how the overall configuration meets the installation requirements. This prevents a favourable component label from being used as unsupported evidence for the entire lineup.<\/p>\n<figure><img decoding=\"async\" alt=\"GGD Low-Voltage Switchgear complete enclosure exterior\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-nameplate-ratings-guide-body1-20261014.png\" style=\"max-width:100%;height:auto\"\/><figcaption>S\u01a1 \u0111\u1ed3 b\u00ean ngo\u00e0i tham chi\u1ebfu s\u1ea3n ph\u1ea9m \u0111\u1ec3 nh\u1eadn d\u1ea1ng thi\u1ebft b\u1ecb; c\u1ea5u h\u00ecnh v\u00e0 th\u00f4ng s\u1ed1 k\u1ef9 thu\u1eadt y\u00eau c\u1ea7u c\u00e1c t\u00e0i li\u1ec7u k\u00e8m theo.<\/figcaption><\/figure><h2>Read voltage and frequency in context<\/h2>\n<p>Voltage declarations can describe different aspects of equipment duty, so preserve their full names and units when recording them. Do not combine operating, insulation or withstand information into a single number labelled voltage. The correct interpretation depends on the actual equipment scope and the manufacturer&#8217;s documents. Review the intended supply system, circuit arrangement and operating conditions against the declared characteristics, including any project-specific restrictions.<\/p>\n<p>Frequency also belongs in the compatibility review. An assembly or component selected for one declared operating condition should not be assumed suitable for another without confirmation. Where the project supply differs from a catalogue assumption, identify that difference explicitly. Avoid asking the supplier only whether the equipment can work: request a documented statement tied to the actual supply and the ordered configuration. This is more useful than an informal answer that omits the conditions under which the rating remains valid.<\/p>\n<h2>Distinguish assembly current from circuit current<\/h2>\n<p>A lineup can include incoming circuits, busbar sections and outgoing circuits with different declared duties. The current value on an individual device does not automatically establish the permitted current through every part of the assembly. The thermal performance of the configuration depends on its design and specified operating conditions. Ask for the assembly and circuit schedule rather than collecting the largest visible current value and applying it across the whole installation.<\/p>\n<p>For low-voltage assemblies, review any declared loading assumptions and the relationship between simultaneous circuit use and verified thermal performance. A project with many heavily loaded circuits may differ from the assumptions behind a generic arrangement. Provide the load information required by the engineer and manufacturer. This article does not calculate an allowable operating current for an unknown assembly; its purpose is to ensure that the current values used in procurement and operation refer to the correct object and conditions.<\/p>\n<h2>Use a rating review table<\/h2>\n<p>The following qualitative table helps organize a submittal or existing-equipment review. It does not supply acceptance values. Final criteria must come from the applicable equipment documents and the project&#8217;s electrical studies.<\/p>\n<p>B\u1ed1i c\u1ea3nh tham kh\u1ea3o: <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32338\" rel=\"noopener nofollow\" target=\"_blank\">IEC 61439-1 low-voltage assembly scope<\/a>. Danh s\u00e1ch ki\u1ec3m tra ch\u1ea5t l\u01b0\u1ee3ng g\u1ed1c n\u00e0y t\u1ed5 ch\u1ee9c c\u00e1c quy\u1ebft \u0111\u1ecbnh c\u1ee7a d\u1ef1 \u00e1n; n\u00f3 kh\u00f4ng ph\u1ea3i l\u00e0 m\u1ed9t ti\u00eau chu\u1ea9n \u0111\u01b0\u1ee3c sao ch\u00e9p ho\u1eb7c thay th\u1ebf cho c\u00e1c ti\u00eau ch\u00ed \u0111\u00e3 \u0111\u01b0\u1ee3c ph\u00ea duy\u1ec7t.<\/p><div class=\"lbaji-table-scroll\" style=\"max-width:100%;overflow-x:auto\"><table style=\"width:100%;border-collapse:collapse\"><thead><tr><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Information category<\/th><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">What to confirm<\/th><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Common interpretation error<\/th><\/tr><\/thead><tbody>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Assembly identity<\/td><td style=\"padding:12px;border:1px solid #ddd\">Actual model, project reference and verified configuration<\/td><td style=\"padding:12px;border:1px solid #ddd\">Treating a generic family name as the delivered design<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Voltage declarations<\/td><td style=\"padding:12px;border:1px solid #ddd\">Full rating names, units and intended system conditions<\/td><td style=\"padding:12px;border:1px solid #ddd\">Using one voltage number for every duty<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Current declarations<\/td><td style=\"padding:12px;border:1px solid #ddd\">Assembly, bus section and circuit boundaries<\/td><td style=\"padding:12px;border:1px solid #ddd\">Taking breaker current as the whole lineup rating<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Short-circuit characteristics<\/td><td style=\"padding:12px;border:1px solid #ddd\">Declared duty and associated conditions<\/td><td style=\"padding:12px;border:1px solid #ddd\">Confusing different short-circuit rating terms<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Service conditions<\/td><td style=\"padding:12px;border:1px solid #ddd\">Temperature, location and environmental assumptions<\/td><td style=\"padding:12px;border:1px solid #ddd\">Applying a rating outside its declared conditions<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Verification evidence<\/td><td style=\"padding:12px;border:1px solid #ddd\">Supporting records for the offered configuration<\/td><td style=\"padding:12px;border:1px solid #ddd\">Treating a device certificate as assembly approval<\/td><\/tr>\n<\/tbody><\/table><\/div>\n<figure><img decoding=\"async\" alt=\"GGD Low-Voltage Switchgear exterior panel reference view\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-nameplate-ratings-guide-body2-20261014.png\" style=\"max-width:100%;height:auto\"\/><figcaption>\u0110\u00e2y l\u00e0 h\u00ecnh \u1ea3nh tham kh\u1ea3o b\u00ean ngo\u00e0i \u0111\u1ec3 th\u1ea3o lu\u1eadn v\u1ec1 l\u1ed1i v\u00e0o, giao di\u1ec7n k\u1ebft n\u1ed1i v\u00e0 vi\u1ec7c ki\u1ec3m tra; \u0111\u00e2y kh\u00f4ng ph\u1ea3i l\u00e0 b\u1ea3n v\u1ebd h\u1ec7 th\u1ed1ng \u0111i\u1ec7n ho\u1eb7c h\u1ec7 th\u1ed1ng d\u00e2y \u0111i\u1ec7n.<\/figcaption><\/figure><h2>Examine short-circuit characteristics separately<\/h2>\n<p>Short-circuit characteristics describe specific equipment duties. Different terms can refer to making, interruption, withstand or conditional performance, depending on the equipment and its applicable requirements. They should not be substituted for one another because their numerical values look similar. Preserve the complete designation and the conditions attached to it. The project engineer must compare the appropriate declared characteristics with the system study and the required protective arrangement.<\/p>\n<p>Where a characteristic depends on a specified protective device or other condition, that condition is part of the evidence. Replacing the associated device may require review even if the replacement has a higher individual rating. Likewise, an assembly&#8217;s withstand declaration should not be treated as an instruction to interrupt a fault through an unspecified component. Ask the supplier to explain the relevant relationships in the circuit schedule and submittal. This review requires engineering judgement; a nameplate photograph alone cannot resolve it.<\/p>\n<h2>Check service conditions and installation assumptions<\/h2>\n<p>Declared characteristics can rely on specified environmental and installation conditions. Request the relevant assumptions for ambient conditions, location, ventilation and the configured enclosure. High elevation, unusual contamination or a change in cooling arrangements may require an engineering assessment. Do not invent a universal correction factor or assume that a larger device automatically compensates for a changed environment. The manufacturer should establish the effect on the actual assembly.<\/p>\n<p>The supplied installation arrangement also matters. Cable interfaces, access requirements and enclosure completion must follow the approved design. A rating plate remains physically attached after a contractor modifies the assembly, but its presence does not justify an unreviewed modification. Keep changes under control and ask what verification is needed to preserve the declared performance. At handover, the record should describe the completed configuration and unresolved deviations, so that future operators do not mistake the original label for approval of every later change.<\/p>\n<h2>Reconcile nameplates with the circuit schedule<\/h2>\n<p>Compare the assembly identification and circuit labels with the approved single-line diagram and equipment schedule. Look for discrepancies in circuit duty, supplied devices, project references and stated conditions. This is a document review followed by the appropriate authorized inspection, not a reason to open energized equipment. Record the exact difference rather than reporting that the plate is wrong. The supplier needs enough evidence to determine whether the label, drawing or delivered configuration requires correction.<\/p>\n<p>Resolve discrepancies before equipment acceptance or a change in duty. A conflicting rating may reflect a document revision, a substituted component or a more substantial design issue. The technical authority should determine the required action and retain the evidence. Do not remove a label and replace it with an owner-created value based on an assumption. Equipment identification is part of traceability, and a correction should come through a supported process tied to the actual assembly and its verified characteristics.<\/p>\n<figure><img decoding=\"async\" alt=\"GGD Low-Voltage Switchgear assembly in planned clean environment\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-nameplate-ratings-guide-body3-20261014.png\" style=\"max-width:100%;height:auto\"\/><figcaption>H\u00ecnh minh h\u1ecda s\u1ea3n ph\u1ea9m v\u1ec1 qu\u00e1 tr\u00ecnh l\u1eafp r\u00e1p trong m\u00f4i tr\u01b0\u1eddng \u0111\u01b0\u1ee3c l\u00ean k\u1ebf ho\u1ea1ch r\u00f5 r\u00e0ng; c\u00e1c th\u00f4ng s\u1ed1 k\u00edch th\u01b0\u1edbc v\u00e0 \u0111i\u1ec1u ki\u1ec7n c\u1ea7n thi\u1ebft s\u1ebd ph\u1ee5 thu\u1ed9c v\u00e0o t\u1eebng d\u1ef1 \u00e1n c\u1ee5 th\u1ec3.<\/figcaption><\/figure><h2>Handle missing or unreadable information<\/h2>\n<p>For existing equipment, a damaged label can make maintenance and procurement difficult. Collect the accessible identification, historical drawings, previous inspection records and device information without creating an unsafe access condition. Contact the manufacturer or qualified assessment provider with the actual equipment reference. Explain which information is missing and which decision it is needed to support, such as spare compatibility or a proposed change in circuit loading.<\/p>\n<p>If supported records cannot establish the required characteristic, record the uncertainty instead of assigning a guessed rating. A cabinet dimension, colour or visible busbar description is not sufficient evidence. The owner may need a formal assessment before the proposed change proceeds. Keep the distinction between an established original characteristic and a new assessment conclusion visible in the record. This allows future engineers to understand what was confirmed, what was inferred and what still requires verification.<\/p>\n<h2>Request a useful supplier data package<\/h2>\n<p>An RFQ should ask for the assembly rating schedule, device schedule, applicable document scope and supporting verification records. Include the site&#8217;s electrical and environmental requirements so that the manufacturer can assess the offered configuration. Require the final identification and circuit references to remain consistent with the delivered drawings. Where a rating depends on a particular arrangement or protective device, request a clear description of that condition rather than a detached numerical value.<\/p>\n<p>The GGD reference used in this article illustrates a real LBAJI low-voltage cabinet lineup. Its exterior meters and device windows help identify the equipment category, but the images intentionally do not fabricate a legible project nameplate. The ordered assembly&#8217;s characteristics must be obtained from its actual records. That distinction is central to a sound procurement decision: images communicate equipment form, while documented ratings establish whether the offered configuration is appropriate for the intended service.<\/p>\n<h2>C\u00e1c c\u00e2u h\u1ecfi th\u01b0\u1eddng g\u1eb7p<\/h2>\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-20261014-5-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Is the breaker current the rating of the whole switchgear lineup?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Not automatically. Confirm the assembly, bus-section and circuit declarations and the configuration&#8217;s verified operating conditions.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261014-5-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Can different short-circuit rating terms be compared directly?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Only after confirming their meanings, equipment scope and associated conditions. Similar numerical values do not establish equivalent duties.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261014-5-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Does a device certificate prove assembly compliance?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. Device evidence and assembly verification address different objects. The supplier must establish the applicable evidence for the complete configuration.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261014-5-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should be done when the plate and drawing disagree?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Record the exact discrepancy and obtain a supported technical resolution. Do not choose the more convenient value or relabel equipment from an assumption.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261014-5-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Can a rating be reconstructed from cabinet dimensions?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. Size and appearance do not establish declared characteristics. Use manufacturer records or an appropriate qualified assessment for missing information.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div><h2>Ngu\u1ed3n th\u00f4ng tin k\u1ef9 thu\u1eadt v\u00e0 thi\u1ebft b\u1ecb li\u00ean quan<\/h2><p>C\u00e1c trang danh m\u1ee5c ti\u00eau chu\u1ea9n x\u00e1c \u0111\u1ecbnh ph\u1ea1m vi t\u00e0i li\u1ec7u; vi\u1ec7c tu\u00e2n th\u1ee7 v\u00e0 ch\u1ea5p nh\u1eadn y\u00eau c\u1ea7u c\u00e1c t\u00e0i li\u1ec7u \u0111\u1ea7y \u0111\u1ee7 \u00e1p d\u1ee5ng v\u00e0 vi\u1ec7c \u0111\u00e1nh gi\u00e1 k\u1ef9 thu\u1eadt d\u1ef1 \u00e1n.<\/p><ul><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32338\" rel=\"noopener nofollow\" target=\"_blank\">IEC 61439-1 low-voltage assembly scope<\/a><\/li><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/63466\" rel=\"noopener nofollow\" target=\"_blank\">Ph\u1ea1m vi c\u1ee7a thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch AC c\u00f3 v\u1ecf b\u1ecdc b\u1eb1ng kim lo\u1ea1i theo ti\u00eau chu\u1ea9n IEC 62271-200<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/san-pham\/ggd-low-voltage-switchgear\/\" rel=\"noopener\">LBAJI GGD Thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch \u0111i\u1ec7n \u00e1p th\u1ea5p<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/blog\/complete-guide-to-switchgear-fundamentals-comparisons\/\" rel=\"noopener\">Nh\u1eefng nguy\u00ean t\u1eafc c\u01a1 b\u1ea3n v\u1ec1 thi\u1ebft b\u1ecb \u0111i\u1ec1u khi\u1ec3n<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/blog\/switchgear-testing-testing-guide\/\" rel=\"noopener\">Ki\u1ec3m tra v\u00e0 th\u1eed nghi\u1ec7m thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/blog\/switchgear-maintenance-checklist-maintenance-guide\/\" rel=\"noopener\">Danh s\u00e1ch ki\u1ec3m tra b\u1ea3o tr\u00ec thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch<\/a><\/li><\/ul><h2>Ti\u1ebfp t\u1ee5c h\u1ecdc t\u1eadp: ch\u1ee9c n\u0103ng c\u1ee7a thi\u1ebft b\u1ecb<\/h2><p>Gi\u00e1o tr\u00ecnh gi\u00e1o d\u1ee5c \u0111\u1ed9c l\u1eadp n\u00e0y gi\u1ea3i th\u00edch v\u1ec1 c\u01a1 s\u1edf thi\u1ebft b\u1ecb. N\u00f3 kh\u00f4ng tr\u00ecnh b\u00e0y quy tr\u00ecnh l\u00e0m vi\u1ec7c an to\u00e0n cho qu\u00e1 tr\u00ecnh l\u1eafp r\u00e1p c\u1ee5 th\u1ec3. Ngu\u1ed3n: Gaurav J \u2013 TheElectricalGuy.<\/p><div style=\"position:relative;width:100%;padding-top:56.25%\" data-video-title=\"Switchgear Basics: Complete Beginner&#x27;s Guide | TheElectricalGuy\" onclick=\"var w=this;setTimeout(function(){var f=w.querySelector(&quot;iframe&quot;);if(f){f.title=w.getAttribute(&quot;data-video-title&quot;);f.loading=&quot;lazy&quot;;}},100);\"><iframe src=\"https:\/\/www.youtube-nocookie.com\/embed\/1eLEa9uqE3k\" title=\"Nh\u1eefng \u0111i\u1ec1u c\u01a1 b\u1ea3n v\u1ec1 thi\u1ebft b\u1ecb \u0111i\u1ec7n: H\u01b0\u1edbng d\u1eabn d\u00e0nh cho ng\u01b0\u1eddi m\u1edbi b\u1eaft \u0111\u1ea7u | TheElectricalGuy\" loading=\"lazy\" allowfullscreen style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0\"><\/iframe><\/div><p><a href=\"https:\/\/www.youtube.com\/watch?v=1eLEa9uqE3k\" rel=\"noopener nofollow\" target=\"_blank\">Xem video Gi\u1edbi thi\u1ec7u v\u1ec1 thi\u1ebft b\u1ecb \u0111i\u1ec7n: H\u01b0\u1edbng d\u1eabn d\u00e0nh cho ng\u01b0\u1eddi m\u1edbi b\u1eaft \u0111\u1ea7u | TheElectricalGuy<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Switchgear nameplate ratings identify the declared characteristics of a particular assembly or device, but they must be read together with the equipment records and project conditions. The assembly rating is not automati<\/p>","protected":false},"author":6,"featured_media":4251,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[58],"tags":[83,88,75],"class_list":["post-4265","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-engineering-guides","tag-power-distribution","tag-procurement-rfq","tag-switchgear"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/4265","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/comments?post=4265"}],"version-history":[{"count":3,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/4265\/revisions"}],"predecessor-version":[{"id":4346,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/4265\/revisions\/4346"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/media\/4251"}],"wp:attachment":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/media?parent=4265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/categories?post=4265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/tags?post=4265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}