{"id":4563,"date":"2026-10-19T01:00:00","date_gmt":"2026-10-19T01:00:00","guid":{"rendered":"https:\/\/lbajiele.com\/?p=4563"},"modified":"2026-10-20T16:52:14","modified_gmt":"2026-10-20T16:52:14","slug":"switchgear-lsc-classification-guide","status":"publish","type":"post","link":"https:\/\/lbajiele.com\/vi\/blog\/switchgear-lsc-classification-guide\/","title":{"rendered":"Thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch LSC Ph\u00e2n lo\u1ea1i: B\u1ec1n v\u1eefng trong ho\u1ea1t \u0111\u1ed9ng v\u00e0 ti\u1ebfp c\u1eadn khoang"},"content":{"rendered":"<p>Switchgear LSC classification describes how access to a high-voltage compartment affects the ability to keep other parts of an assembly in service. For a buyer, the useful question is which circuits must be taken out of service for a defined maintenance task. A category name alone cannot answer every access question. Request the manufacturer\u2019s classification, the applicable standard edition, compartment drawings and the operating conditions behind the claim. Then compare those conditions with the actual maintenance work your site expects to perform. External appearance, a removable breaker and an internal arc classification do not independently establish an LSC category.<\/p>\n<h2>Start with the maintenance task<\/h2>\n<p>Consider a plant that wants to inspect one feeder while keeping unrelated production supplied. The engineering team must first identify what inspection involves: accessing the breaker compartment, inspecting a cable termination, or working on another high-voltage compartment. Those are different access cases. A specification that only says \u201cmaintenance without shutdown\u201d leaves the most important boundary unresolved.<\/p>\n<p>Write down the target functional unit, the compartment to be opened, the equipment that will be isolated, and the circuits expected to remain energized. Include the necessary earthing and access arrangements in the manufacturer\u2019s operating procedure. This creates a practical question that the supplier can answer against the proposed construction. It also prevents different bidders from interpreting an attractive service-continuity statement in different ways.<\/p>\n<h2>Understand what the classification applies to<\/h2>\n<p>IEC 62271-200 addresses prefabricated metal-enclosed AC switchgear within its stated voltage scope. Its LSC framework concerns service continuity when access is provided to high-voltage compartments. It should be read with the applicable assembly documentation and the current project specification. The IEC catalogue establishes the document\u2019s scope; detailed acceptance requires the full applicable standard and a competent engineering review.<\/p>\n<p>The familiar designations LSC1, LSC2, LSC2A and LSC2B are not a substitute for describing the access case. Broadly, the LSC2 family concerns retaining other functional units in service under defined conditions. The distinctions within that family relate to the compartment arrangement and the parts that can remain energized during specified access. Require the supplier to state the exact category and illustrate its meaning for every relevant unit rather than accepting an unqualified hierarchy of \u201cgood\u201d and \u201cbetter.\u201d<\/p>\n<figure><img decoding=\"async\" alt=\"KYN61-40.5 Armouring Removable AC Metal Enclosed Switchgear complete enclosure exterior\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-lsc-classification-guide-body1-20261017.png\" style=\"max-width:100%;height:auto\"\/><figcaption>Exterior product-reference illustration for compartment and asset identification. Internal boundaries and LSC classification require the offered assembly documentation.<\/figcaption><\/figure><h2>Read the compartment boundary before the brochure<\/h2>\n<p>A functional unit may contain several high-voltage compartments with different access provisions. Ask for a drawing that identifies the main switching device, busbar and cable compartments, their partitioning, and the permitted access routes. The drawing should match the offered configuration, including metering, auxiliary functions and any project-specific modifications. A generic family diagram can be useful background but does not establish the final arrangement.<\/p>\n<p>Distinguish accessible compartments from compartments that the operating instructions do not permit users to open in normal maintenance. Record whether access relies on an interlock, a prescribed procedure or tools, as applicable to the design. These details affect the work plan and competence requirements. They should not be reduced to a photograph of closed doors, because external seams cannot confirm the internal electrical boundaries.<\/p>\n<h2>Compare categories through an access matrix<\/h2>\n<p>Use a project matrix to connect the classification claim with operational consequences. Each row should describe one task and one compartment. The supplier should identify which main-circuit sections must be isolated and earthed, which other units may remain supplied, and the operating instruction that governs access. Have the owner\u2019s electrical engineer review unresolved cases before equipment selection.<\/p>\n<p>B\u1ed1i c\u1ea3nh tham kh\u1ea3o: <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/96236\" rel=\"noopener nofollow\" target=\"_blank\">IEC 62271-200:2021 with Amendment 1:2024, metal-enclosed AC assembly scope<\/a>. Danh s\u00e1ch ki\u1ec3m tra ch\u1ea5t l\u01b0\u1ee3ng g\u1ed1c n\u00e0y t\u1ed5 ch\u1ee9c c\u00e1c quy\u1ebft \u0111\u1ecbnh c\u1ee7a d\u1ef1 \u00e1n; n\u00f3 kh\u00f4ng ph\u1ea3i l\u00e0 m\u1ed9t ti\u00eau chu\u1ea9n \u0111\u01b0\u1ee3c sao ch\u00e9p ho\u1eb7c thay th\u1ebf cho c\u00e1c ti\u00eau ch\u00ed \u0111\u00e3 \u0111\u01b0\u1ee3c ph\u00ea duy\u1ec7t.<\/p><div class=\"lbaji-table-scroll\" style=\"max-width:100%;overflow-x:auto\"><table style=\"width:100%;border-collapse:collapse\"><thead><tr><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Project question<\/th><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Supplier evidence<\/th><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Decision supported<\/th><\/tr><\/thead><tbody>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Which compartment will be opened?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Identified compartment on the offered unit drawing<\/td><td style=\"padding:12px;border:1px solid #ddd\">Whether the intended task matches the declared access case<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Which circuits lose service?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Isolation boundary and manufacturer\u2019s operating instructions<\/td><td style=\"padding:12px;border:1px solid #ddd\">Whether the outage affects essential loads<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">What can remain energized?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Explicit permitted states for adjacent units and relevant sections<\/td><td style=\"padding:12px;border:1px solid #ddd\">Whether the proposed continuity benefit is usable<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Which configuration was assessed?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Assembly identification, variant and classification documentation<\/td><td style=\"padding:12px;border:1px solid #ddd\">Whether the evidence applies to the supplied equipment<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">What changes at installation?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Interface and installation conditions with assigned responsibility<\/td><td style=\"padding:12px;border:1px solid #ddd\">Whether site work preserves the declared arrangement<\/td><\/tr>\n<\/tbody><\/table><\/div>\n<p>This is an original qualitative procurement tool. It does not reproduce standard definitions or authorize work. If the supplier cannot complete a row, treat that row as an open technical clarification. Do not fill the gap by assuming that the highest category advertised anywhere in a product family applies to every functional unit you are buying.<\/p>\n<h2>Keep LSC separate from internal arc classification<\/h2>\n<p>Loss of service continuity and internal arc classification answer different questions. LSC addresses the operational effect of defined access. Internal arc classification concerns performance under specified internal arc test conditions. One designation does not prove the other, and neither allows a site to ignore electrical work rules, manufacturer instructions or its own risk assessment.<\/p>\n<p>This distinction matters when purchasing documents combine several classifications in one line. Ask the supplier to separate the evidence and conditions for each claim. For internal arc information, review the accessible sides, test configuration and installation conditions through the relevant documentation. For service continuity, return to the access matrix. Keep the two reviews connected in the project file while retaining their separate acceptance criteria.<\/p>\n<figure><img decoding=\"async\" alt=\"KYN61-40.5 Armouring Removable AC Metal Enclosed Switchgear exterior panel reference view\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-lsc-classification-guide-body2-20261017.png\" style=\"max-width:100%;height:auto\"\/><figcaption>Exterior product-reference illustration for compartment and asset identification. Internal boundaries and LSC classification require the offered assembly documentation.<\/figcaption><\/figure><h2>A withdrawable breaker does not settle the question<\/h2>\n<p>A removable or withdrawable switching device may support maintenance objectives, but that feature alone does not establish the classification of the complete assembly. The busbar, cable compartment, partitions, shutters and access arrangements determine the relevant boundaries. The manufacturer must confirm the applicable category for the actual functional unit and configuration.<\/p>\n<p>Similarly, fixed equipment should be evaluated against its declared construction and access conditions rather than rejected from a photograph. Procurement should begin with the owner\u2019s maintenance need and compare documented solutions. If a removable device introduces additional handling, storage or inspection requirements, include those requirements in the lifecycle review. A continuity benefit is useful only if the site can operate and maintain the design correctly.<\/p>\n<h2>Check the network consequence as well as the cabinet<\/h2>\n<p>An assembly may permit other units to remain energized, yet the network can still require a wider outage. Shared upstream supplies, protection arrangements, a single bus section or a process dependency can change the practical result. Review the single-line diagram with the proposed access case. Identify essential loads, alternate supplies and the owner-approved switching plan.<\/p>\n<p>For example, a plant might retain neighbouring feeders during one compartment inspection but still lose the process served by the isolated feeder. That is a meaningful benefit, not uninterrupted service to every load. Describe it accurately in the business case. Avoid converting a cabinet classification into a guaranteed plant-availability figure without a separate system assessment and realistic maintenance assumptions.<\/p>\n<h2>Make the evidence traceable to the delivered units<\/h2>\n<p>Request a schedule that connects each functional unit identifier with the declared LSC category, applicable document edition, drawing revision and operating manual. The supplier should explain exceptions, including unusual metering arrangements or interfaces. Keep the approved schedule in the purchase order so later substitutions require a documented review of their effect on access and continuity.<\/p>\n<p>At factory acceptance, compare physical identification and accessible construction with the approved documents using an agreed inspection scope. Do not improvise hazardous access demonstrations or energization states to \u201cprove\u201d a category. Testing and demonstrations need an approved method, competent personnel and appropriate isolation. Missing evidence should become a formal hold point or clarification rather than an undocumented verbal assurance at shipment.<\/p>\n<figure><img decoding=\"async\" alt=\"KYN61-40.5 Armouring Removable AC Metal Enclosed Switchgear assembly in planned clean environment\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-lsc-classification-guide-body3-20261017.png\" style=\"max-width:100%;height:auto\"\/><figcaption>Exterior product-reference illustration for compartment and asset identification. Internal boundaries and LSC classification require the offered assembly documentation.<\/figcaption><\/figure><h2>Preserve the arrangement through installation and change<\/h2>\n<p>Cable interfaces, site-installed partitions, modified openings and added equipment can affect the completed arrangement. Assign responsibility for reviewing deviations before they are built. Ask the manufacturer which installation conditions are necessary for the declared classification and how departures should be assessed. Record the accepted configuration in the as-built documentation.<\/p>\n<p>Later extension or retrofit projects should revisit those records. A replacement device that fits mechanically may still alter access or partitioning assumptions. Changes to the operating procedure may also change how the continuity benefit is used. Keep a controlled record of modifications, obtain the necessary supplier or engineering assessment, and update the maintenance matrix. An old brochure should not become permanent evidence for a modified assembly.<\/p>\n<h2>Plan safe access and operator training<\/h2>\n<p>An LSC designation does not mean that a compartment is safe to open while live. Qualified personnel must follow the applicable electrical work requirements, isolation procedures and manufacturer instructions. In the United States, 29 CFR 1910.333 provides relevant electrical work-practice requirements; its applicability depends on the workplace and task. Other jurisdictions require their own legal and technical review.<\/p>\n<p>Training should cover equipment identity, approved operating states, access restrictions and how to stop when the observed arrangement differs from the manual. Include responsibilities for switching authorization and return-to-service checks. Keep classification explanations separate from step-by-step operating instructions: a procurement article cannot provide a safe switching sequence for equipment whose configuration and site conditions have not been established.<\/p>\n<h2>Put the right questions into the RFQ<\/h2>\n<p>An effective request for quotation states the required maintenance outcomes and asks the supplier to demonstrate how its proposed classification supports them. Include the target compartment tasks, the circuits expected to remain available, the required drawing and manual deliverables, and the process for resolving exceptions. Request lifecycle support for any configuration-specific access components and documentation.<\/p>\n<p>LBAJI\u2019s KYN61 product exterior is used here solely to illustrate equipment identification and enclosure documentation. The photograph and its generated reference illustrations do not establish the LSC category of a particular order. Obtain the offered unit\u2019s current technical confirmation. Purchase on the documented assembly and operating boundary, then retain those records for maintenance planning, future extensions and responsible equipment handover.<\/p>\n<h2>C\u00e1c c\u00e2u h\u1ecfi th\u01b0\u1eddng g\u1eb7p<\/h2>\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-20261017-1-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What does LSC mean in switchgear?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>LSC means loss of service continuity. It describes how access to high-voltage compartments affects the ability to retain other parts of the assembly in service under defined conditions.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261017-1-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Is LSC2B automatically the right specification?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Select the classification through the actual access tasks and required outage boundaries. A higher advertised designation is not a substitute for checking the offered unit, its operating conditions and the site\u2019s maintenance needs.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261017-1-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Does a withdrawable breaker prove an LSC category?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. The complete compartment arrangement and applicable manufacturer documentation must support the category of the actual functional unit.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261017-1-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Is LSC the same as internal arc classification?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. They address different properties and require separate evidence. Neither replaces approved electrical work procedures or the applicable safety requirements.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261017-1-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What documents should a buyer request?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Request a unit-by-unit classification schedule, applicable standard edition, compartment drawings, operating instructions, configuration identification and an access matrix covering the intended maintenance tasks.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div><h2>Ngu\u1ed3n th\u00f4ng tin k\u1ef9 thu\u1eadt v\u00e0 thi\u1ebft b\u1ecb li\u00ean quan<\/h2><p>C\u00e1c trang danh m\u1ee5c ti\u00eau chu\u1ea9n x\u00e1c \u0111\u1ecbnh ph\u1ea1m vi t\u00e0i li\u1ec7u; vi\u1ec7c tu\u00e2n th\u1ee7 v\u00e0 ch\u1ea5p nh\u1eadn y\u00eau c\u1ea7u c\u00e1c t\u00e0i li\u1ec7u \u0111\u1ea7y \u0111\u1ee7 \u00e1p d\u1ee5ng v\u00e0 vi\u1ec7c \u0111\u00e1nh gi\u00e1 k\u1ef9 thu\u1eadt d\u1ef1 \u00e1n.<\/p><ul><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/96236\" rel=\"noopener nofollow\" target=\"_blank\">IEC 62271-200:2021 with Amendment 1:2024, metal-enclosed AC assembly scope<\/a><\/li><li><a href=\"https:\/\/www.hse.gov.uk\/pubns\/books\/hsg85.htm\" rel=\"noopener nofollow\" target=\"_blank\">UK HSE HSG85: Electricity at work, safe working practices<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/san-pham\/kyn61-40-5-armouring-removable-ac-metal-enclosed-switchgear\/\" rel=\"noopener\">LBAJI KYN61-40.5 Thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch c\u00f3 th\u1ec3 th\u00e1o r\u1eddi b\u1eb1ng th\u00e9p kh\u00f4ng g\u1ec9<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/blog\/complete-guide-to-switchgear-fundamentals-comparisons\/\" rel=\"noopener\">Nh\u1eefng nguy\u00ean t\u1eafc c\u01a1 b\u1ea3n v\u1ec1 thi\u1ebft b\u1ecb \u0111i\u1ec1u khi\u1ec3n<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/blog\/switchgear-testing-testing-guide\/\" rel=\"noopener\">Ki\u1ec3m tra v\u00e0 th\u1eed nghi\u1ec7m thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/blog\/switchgear-factory-acceptance-test-buyer-witness-checklist\/\" rel=\"noopener\">S\u1ed5 ghi nh\u1eadn c\u1ee7a nh\u00e2n ch\u1ee9ng khi nghi\u1ec7m thu nh\u00e0 m\u00e1y<\/a><\/li><\/ul><h2>H\u1ecdc t\u1eadp n\u00e2ng cao: ki\u1ebfn th\u1ee9c chuy\u00ean m\u00f4n<\/h2><p>Video gi\u00e1o d\u1ee5c \u0111\u1ed9c l\u1eadp n\u00e0y gi\u1ea3i th\u00edch c\u00e1c nguy\u00ean t\u1eafc \u0111o l\u01b0\u1eddng v\u00e0 n\u1ec1n t\u1ea3ng thi\u1ebft b\u1ecb \u0111\u00e3 \u0111\u01b0\u1ee3c \u0111\u1ec1 c\u1eadp \u1edf tr\u00ean. N\u00f3 kh\u00f4ng tr\u00ecnh b\u00e0y quy tr\u00ecnh l\u00e0m vi\u1ec7c an to\u00e0n cho qu\u00e1 tr\u00ecnh l\u1eafp r\u00e1p c\u1ee5 th\u1ec3. Ngu\u1ed3n: Gaurav J \u2013 TheElectricalGuy.<\/p><div data-video-title=\"Switchgear Basics: Complete Beginner&#x27;s Guide | TheElectricalGuy\" onclick=\"var w=this;setTimeout(function(){var f=w.querySelector(&quot;iframe&quot;);if(f){f.title=w.getAttribute(&quot;data-video-title&quot;);f.loading=&quot;lazy&quot;;}},100);\" style=\"position:relative;width:100%;padding-top:56.25%\"><iframe src=\"https:\/\/www.youtube-nocookie.com\/embed\/1eLEa9uqE3k\" title=\"Nh\u1eefng \u0111i\u1ec1u c\u01a1 b\u1ea3n v\u1ec1 thi\u1ebft b\u1ecb \u0111i\u1ec7n: H\u01b0\u1edbng d\u1eabn d\u00e0nh cho ng\u01b0\u1eddi m\u1edbi b\u1eaft \u0111\u1ea7u | TheElectricalGuy\" loading=\"lazy\" allowfullscreen style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0\"><\/iframe><\/div><p><a href=\"https:\/\/www.youtube.com\/watch?v=1eLEa9uqE3k\" rel=\"noopener nofollow\" target=\"_blank\">Xem video Gi\u1edbi thi\u1ec7u v\u1ec1 thi\u1ebft b\u1ecb \u0111i\u1ec7n: H\u01b0\u1edbng d\u1eabn d\u00e0nh cho ng\u01b0\u1eddi m\u1edbi b\u1eaft \u0111\u1ea7u | TheElectricalGuy<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Ph\u00e2n lo\u1ea1i LSC c\u1ee7a thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch m\u00f4 t\u1ea3 c\u00e1ch ti\u1ebfp c\u1eadn v\u1edbi khoang \u0111i\u1ec7n \u00e1p cao \u1ea3nh h\u01b0\u1edfng \u0111\u1ebfn kh\u1ea3 n\u0103ng duy tr\u00ec ho\u1ea1t \u0111\u1ed9ng c\u1ee7a c\u00e1c b\u1ed9 ph\u1eadn kh\u00e1c trong h\u1ec7 th\u1ed1ng. \u0110\u1ed1i v\u1edbi ng\u01b0\u1eddi mua, c\u00e2u h\u1ecfi h\u1eefu \u00edch l\u00e0 nh\u1eefng m\u1ea1ch n\u00e0o c\u1ea7n ph\u1ea3i \u0111\u01b0\u1ee3c th\u00e1o ra. <\/p>","protected":false},"author":6,"featured_media":4558,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[58],"tags":[83,88,75],"class_list":["post-4563","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-engineering-guides","tag-power-distribution","tag-procurement-rfq","tag-switchgear"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/4563","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/comments?post=4563"}],"version-history":[{"count":2,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/4563\/revisions"}],"predecessor-version":[{"id":4777,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/4563\/revisions\/4777"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/media\/4558"}],"wp:attachment":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/media?parent=4563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/categories?post=4563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/tags?post=4563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}