{"id":4773,"date":"2026-10-23T01:00:00","date_gmt":"2026-10-23T01:00:00","guid":{"rendered":"https:\/\/lbajiele.com\/?p=4773"},"modified":"2026-10-20T16:52:49","modified_gmt":"2026-10-20T16:52:49","slug":"switchgear-earthing-switch-selection-guide","status":"publish","type":"post","link":"https:\/\/lbajiele.com\/vi\/blog\/switchgear-earthing-switch-selection-guide\/","title":{"rendered":"Switchgear Earthing Switch: Duty, Interlocks and Specification"},"content":{"rendered":"<p>A switchgear earthing switch connects a defined part of the primary circuit to earth when operated under its approved conditions. Specifying it requires more than selecting an operating handle: the project must establish the circuit being earthed, applicable duties, interlocks, position indications and evidence for the supplied arrangement. It is a different subject from the enclosure&#8217;s protective bonding network. For a medium-voltage procurement package, a useful specification connects the device&#8217;s documented capability to a clear operating-state matrix and the site&#8217;s authorized safety procedures.<\/p>\n<h2>Distinguish the earthing switch from protective bonding<\/h2>\n<p>Protective bonding connects conductive parts such as enclosures to the intended protective earthing system. An earthing switch is a switching device associated with a defined primary circuit. These functions interact in the complete installation, but they do not have the same specification or verification boundary.<\/p>\n<p>A drawing should identify the earthing switch location, the primary conductors it connects and the associated earth path. Do not infer this arrangement from a visible earth bar or cabinet label. For a multi-compartment assembly, establish whether the device earths a cable circuit, another circuit section or a particular configuration. The precise scope belongs in the single-line and arrangement documents.<\/p>\n<h2>Begin with the operating purpose<\/h2>\n<p>Ask what work or operating state the earthing switch is intended to support and who controls that state. The answer must be compatible with the assembly design and the site&#8217;s safety rules. An earthing switch can be part of a controlled safety arrangement, but its presence does not by itself prove the absence of voltage or establish permission to access equipment.<\/p>\n<p>Potential sources can include the normal supply, another feeder, a connected generator or other project-specific paths. The responsible engineer must review the actual system. A simple radial diagram used for discussion must not be assumed to represent a more complex installation. Record the agreed operating boundary and relevant alternative supply conditions.<\/p>\n<figure><img decoding=\"async\" alt=\"KYN61-40.5 Armouring Removable AC Metal Enclosed Switchgear complete enclosure exterior\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-earthing-switch-selection-guide-body1-20261021.png\" style=\"max-width:100%;height:auto\"\/><figcaption>S\u01a1 \u0111\u1ed3 b\u00ean ngo\u00e0i tham chi\u1ebfu s\u1ea3n ph\u1ea9m \u0111\u1ec3 nh\u1eadn d\u1ea1ng thi\u1ebft b\u1ecb; c\u1ea5u h\u00ecnh v\u00e0 th\u00f4ng s\u1ed1 k\u1ef9 thu\u1eadt y\u00eau c\u1ea7u c\u00e1c t\u00e0i li\u1ec7u k\u00e8m theo.<\/figcaption><\/figure><h2>Specify duties using the applicable equipment documentation<\/h2>\n<p>An earthing switch has defined characteristics that must be suitable for its application. The applicable standard family and supplied manufacturer&#8217;s data establish which duties and classifications are relevant. A buyer should request the declared ratings and evidence rather than treating every device as equivalent because it fits within the same cabinet.<\/p>\n<p>Do not assume that an earthing switch is intended to interrupt load current. Similarly, short-circuit making capability and short-time withstand describe different aspects of duty. The project specification should identify the required characteristics and have the supplier confirm the complete arrangement. A broad assembly fault rating is not enough to explain every component&#8217;s individual duty.<\/p>\n<h2>Review the actual circuit diagram<\/h2>\n<p>Use the single-line diagram to locate the earthing switch electrically and the arrangement drawing to understand its physical relationship with compartments and access points. Confirm the delivered configuration against both. An optional device shown in a catalogue should not be assumed to be included in an order unless the project documents establish that scope.<\/p>\n<p>For an LBAJI KYN61 assembly, the product page provides the equipment-family reference. It does not establish the exact earthing switch model, location or ratings for a particular project. Request those details through the offered configuration, drawings and supporting test documentation. This prevents an enclosure photograph from becoming an unsupported statement about internal equipment.<\/p>\n<h2>Build an operating-state matrix<\/h2>\n<p>A useful matrix states the permitted and prevented actions for each relevant equipment state. Depending on the actual design, the review may need to consider breaker position, primary switching state, earthing switch state, compartment access and key or electrical control conditions. The supplier should explain the implemented logic and any project-specific options.<\/p>\n<p>Keep the matrix precise enough to verify. A phrase such as &#8216;complete safety interlocking&#8217; does not tell a witness which action should be prevented under a defined state. Record the required action, prerequisite state, expected response and verification evidence. Resolve exceptions before acceptance rather than relying on an operator to discover them after delivery.<\/p>\n<p>B\u1ed1i c\u1ea3nh tham kh\u1ea3o: <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/78724\" rel=\"noopener nofollow\" target=\"_blank\">IEC 62271-102 disconnectors and earthing switches scope<\/a>. Danh s\u00e1ch ki\u1ec3m tra ch\u1ea5t l\u01b0\u1ee3ng g\u1ed1c n\u00e0y t\u1ed5 ch\u1ee9c c\u00e1c quy\u1ebft \u0111\u1ecbnh c\u1ee7a d\u1ef1 \u00e1n; n\u00f3 kh\u00f4ng ph\u1ea3i l\u00e0 m\u1ed9t ti\u00eau chu\u1ea9n \u0111\u01b0\u1ee3c sao ch\u00e9p ho\u1eb7c thay th\u1ebf cho c\u00e1c ti\u00eau ch\u00ed \u0111\u00e3 \u0111\u01b0\u1ee3c ph\u00ea duy\u1ec7t.<\/p><div class=\"lbaji-table-scroll\" style=\"max-width:100%;overflow-x:auto\"><table style=\"width:100%;border-collapse:collapse\"><thead><tr><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Specification item<\/th><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">Question to resolve<\/th><th scope=\"col\" style=\"padding:12px;text-align:left;border:1px solid #ddd\">B\u1eb1ng ch\u1ee9ng \u0111\u1ec3 y\u00eau c\u1ea7u<\/th><\/tr><\/thead><tbody>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Electrical location<\/td><td style=\"padding:12px;border:1px solid #ddd\">Which conductors are connected to earth?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Single-line diagram and earthing arrangement<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Declared duty<\/td><td style=\"padding:12px;border:1px solid #ddd\">Which ratings and classifications apply?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Device data and applicable verification records<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Permitted operations<\/td><td style=\"padding:12px;border:1px solid #ddd\">Under what states may the switch operate?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Approved operating-state matrix<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Position indication<\/td><td style=\"padding:12px;border:1px solid #ddd\">How is the actual position established?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Manufacturer indication and verification description<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Access relationship<\/td><td style=\"padding:12px;border:1px solid #ddd\">What access is permitted or prevented?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Compartment and interlock drawings<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">Control interfaces<\/td><td style=\"padding:12px;border:1px solid #ddd\">Are keys or electrical conditions involved?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Key schedule and control-circuit documents<\/td><\/tr>\n<tr><td style=\"padding:12px;border:1px solid #ddd\">B\u00e0n giao<\/td><td style=\"padding:12px;border:1px solid #ddd\">What restrictions and procedures apply?<\/td><td style=\"padding:12px;border:1px solid #ddd\">Operating instructions and deviation closure<\/td><\/tr>\n<\/tbody><\/table><\/div>\n<figure><img decoding=\"async\" alt=\"KYN61-40.5 Armouring Removable AC Metal Enclosed Switchgear exterior panel reference view\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-earthing-switch-selection-guide-body2-20261021.png\" style=\"max-width:100%;height:auto\"\/><figcaption>\u0110\u00e2y l\u00e0 h\u00ecnh \u1ea3nh tham kh\u1ea3o b\u00ean ngo\u00e0i \u0111\u1ec3 th\u1ea3o lu\u1eadn v\u1ec1 l\u1ed1i v\u00e0o, giao di\u1ec7n k\u1ebft n\u1ed1i v\u00e0 vi\u1ec7c ki\u1ec3m tra; \u0111\u00e2y kh\u00f4ng ph\u1ea3i l\u00e0 b\u1ea3n v\u1ebd h\u1ec7 th\u1ed1ng \u0111i\u1ec7n ho\u1eb7c h\u1ec7 th\u1ed1ng d\u00e2y \u0111i\u1ec7n.<\/figcaption><\/figure><h2>Check interlock interfaces without bypassing them<\/h2>\n<p>Mechanical, electrical and key-based interlocks can enforce different parts of an operating sequence. A complete review identifies which mechanism performs each function and which information it relies on. An interlock that uses an auxiliary signal has a different boundary from a direct mechanical restriction, and that distinction should be documented.<\/p>\n<p>Verification must follow the supplied instructions and an authorized test plan. Do not defeat an interlock to demonstrate a sequence or treat resistance to operation as an invitation to use more force. If the expected action is not possible, stop and investigate the equipment state and instructions. The report should preserve the observed condition and the resulting decision.<\/p>\n<h2>Evaluate position indication carefully<\/h2>\n<p>A handle position, mimic indication, auxiliary contact and direct view of a mechanism do not necessarily provide identical evidence. The manufacturer&#8217;s documentation should explain what each indication represents and how the relevant state is verified. Use that explanation to define the project acceptance checks.<\/p>\n<p>Where remote indications are required, identify the signals and their destination in the control system. A correct local indication does not prove that the remote label or alarm is correct. Functional checks should establish channel identity, polarity where relevant and expected state behavior. Record any limitations so operators understand which indications can support the approved operating procedure.<\/p>\n<h2>Consider interfaces with cables and other equipment<\/h2>\n<p>The circuit associated with an earthing switch may extend beyond the assembly. Cable connections, alternative supplies and adjacent equipment can affect the operating boundary. Coordinate those interfaces through the project drawings and site work controls. Do not assume that the switch&#8217;s local location describes the complete electrical zone involved.<\/p>\n<p>The supplier and purchaser should agree responsibility for information about the external system. This includes any special operating conditions, key exchanges or remote control dependencies. A factory inspection can verify the supplied assembly within its test boundary, while site commissioning must verify the completed interfaces. Record both scopes rather than treating a factory report as proof of the whole installation.<\/p>\n<figure><img decoding=\"async\" alt=\"KYN61-40.5 Armouring Removable AC Metal Enclosed Switchgear assembly in planned clean environment\" loading=\"lazy\" src=\"https:\/\/lbajiele.com\/wp-content\/uploads\/2026\/10\/switchgear-earthing-switch-selection-guide-body3-20261021.png\" style=\"max-width:100%;height:auto\"\/><figcaption>H\u00ecnh minh h\u1ecda s\u1ea3n ph\u1ea9m v\u1ec1 qu\u00e1 tr\u00ecnh l\u1eafp r\u00e1p trong m\u00f4i tr\u01b0\u1eddng \u0111\u01b0\u1ee3c l\u00ean k\u1ebf ho\u1ea1ch r\u00f5 r\u00e0ng; c\u00e1c th\u00f4ng s\u1ed1 k\u00edch th\u01b0\u1edbc v\u00e0 \u0111i\u1ec1u ki\u1ec7n c\u1ea7n thi\u1ebft s\u1ebd ph\u1ee5 thu\u1ed9c v\u00e0o t\u1eebng d\u1ef1 \u00e1n c\u1ee5 th\u1ec3.<\/figcaption><\/figure><h2>Request applicable verification evidence<\/h2>\n<p>Ask the supplier to identify the test or design evidence supporting the declared device and assembly characteristics. The report must be applicable to the supplied configuration, with any differences explained. A certificate for another mechanism or arrangement requires a documented applicability review; a shared manufacturer name is not sufficient.<\/p>\n<p>Distinguish qualification evidence from routine project checks. The purchaser may review applicable design reports while witnessing an operating or interlock check on the delivered assembly. These activities answer different questions. Avoid asking a routine factory operation to demonstrate a fault-duty characteristic that requires a different kind of verification.<\/p>\n<h2>Plan maintenance around the supplied design<\/h2>\n<p>The manufacturer&#8217;s instructions should define inspection, servicing and replacement requirements. The maintenance plan should account for the actual operating duty, environment, service history and the site&#8217;s risk assessment. This article does not establish a universal number of operations or inspection interval.<\/p>\n<p>Record abnormal effort, damaged indications, inconsistent interlocks or other observed changes for engineering assessment. Do not adjust linkages, substitute keys or apply unapproved lubricants to obtain a preferred feel. After authorized maintenance, complete the specified functional checks and update the records. The purpose is to preserve the designed relationships among mechanism, indication and access control.<\/p>\n<h2>Make the procurement question set concrete<\/h2>\n<p>Before approving a quotation, confirm the electrical location, declared duties, operating arrangement, interlock matrix, local and remote indication, applicable reports and included instructions. Identify any optional features explicitly. Agree the witness scope and treatment of deviations so that the delivery package can be checked against a clear requirement.<\/p>\n<p>If the supplier proposes a substitute device, review more than dimensions. Ratings, interfaces, indication behavior and supporting verification may differ. Update the drawings and operating documents after an accepted change. The operator should receive a consistent set of information describing the equipment actually delivered, rather than a mixture of original and replacement configurations.<\/p>\n<h2>Handover with clear operating boundaries<\/h2>\n<p>Commissioning should establish that the completed installation matches the approved drawings and the agreed functional requirements. The final record should include test results, interlock findings, indication checks and outstanding restrictions. An unresolved discrepancy should remain visible until the responsible engineer closes it.<\/p>\n<p>Operating instructions must work with the site&#8217;s electrical safety process. An earthing switch is one component of that controlled system and should never be presented as a substitute for authorization, isolation and verification. Clear documentation helps users understand the device&#8217;s purpose while preventing an equipment feature from being mistaken for a complete safety decision.<\/p>\n<h2>C\u00e1c c\u00e2u h\u1ecfi th\u01b0\u1eddng g\u1eb7p<\/h2>\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-20261021-4-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What does a switchgear earthing switch do?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>It connects a defined primary circuit section to earth under its approved operating conditions. The exact electrical boundary must be established by the supplied drawings and instructions.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261021-4-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Is it the same as the cabinet earth bar?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. The enclosure&#8217;s protective bonding network and a primary-circuit earthing switch have different functions and verification boundaries, even though they form parts of the same installation.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261021-4-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Can an earthing switch interrupt normal load current?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Do not assume so. Confirm the actual device duties and permitted operations using its declared characteristics and the approved operating instructions.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261021-4-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Does a closed earthing switch alone authorize access?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. Access requires the site&#8217;s complete authorized safety procedure and the relevant equipment conditions. Position indication and interlocks support defined functions within that process.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-20261021-4-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should a buyer request before acceptance?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Request the circuit location, declared ratings, applicable verification, operating-state matrix, indication details, interface drawings, instructions and closure of any deviations.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div><h2>Ngu\u1ed3n th\u00f4ng tin k\u1ef9 thu\u1eadt v\u00e0 thi\u1ebft b\u1ecb li\u00ean quan<\/h2><p>C\u00e1c trang danh m\u1ee5c ti\u00eau chu\u1ea9n x\u00e1c \u0111\u1ecbnh ph\u1ea1m vi t\u00e0i li\u1ec7u; vi\u1ec7c tu\u00e2n th\u1ee7 v\u00e0 ch\u1ea5p nh\u1eadn y\u00eau c\u1ea7u c\u00e1c t\u00e0i li\u1ec7u \u0111\u1ea7y \u0111\u1ee7 \u00e1p d\u1ee5ng v\u00e0 vi\u1ec7c \u0111\u00e1nh gi\u00e1 k\u1ef9 thu\u1eadt d\u1ef1 \u00e1n.<\/p><ul><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/78724\" rel=\"noopener nofollow\" target=\"_blank\">IEC 62271-102 disconnectors and earthing switches scope<\/a><\/li><li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/63466\" rel=\"noopener nofollow\" target=\"_blank\">Ph\u1ea1m vi c\u1ee7a thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch AC c\u00f3 v\u1ecf b\u1ecdc b\u1eb1ng kim lo\u1ea1i theo ti\u00eau chu\u1ea9n IEC 62271-200<\/a><\/li><li><a href=\"https:\/\/www.hse.gov.uk\/pubns\/books\/hsg85.htm\" rel=\"noopener nofollow\" target=\"_blank\">UK HSE HSG85: Electricity at work, safe working practices<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/san-pham\/kyn61-40-5-armouring-removable-ac-metal-enclosed-switchgear\/\" rel=\"noopener\">LBAJI KYN61-40.5 Thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch c\u00f3 th\u1ec3 th\u00e1o r\u1eddi b\u1eb1ng th\u00e9p kh\u00f4ng g\u1ec9<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/blog\/complete-guide-to-switchgear-fundamentals-comparisons\/\" rel=\"noopener\">Nh\u1eefng nguy\u00ean t\u1eafc c\u01a1 b\u1ea3n v\u1ec1 thi\u1ebft b\u1ecb \u0111i\u1ec1u khi\u1ec3n<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/blog\/switchgear-testing-testing-guide\/\" rel=\"noopener\">Ki\u1ec3m tra v\u00e0 th\u1eed nghi\u1ec7m thi\u1ebft b\u1ecb chuy\u1ec3n m\u1ea1ch<\/a><\/li><li><a href=\"https:\/\/lbajiele.com\/vi\/blog\/switchgear-thermal-imaging-guide\/\" rel=\"noopener\">switchgear thermal inspection evidence<\/a><\/li><\/ul><h2>H\u1ecdc t\u1eadp n\u00e2ng cao: ki\u1ebfn th\u1ee9c chuy\u00ean m\u00f4n<\/h2><p>Video gi\u00e1o d\u1ee5c \u0111\u1ed9c l\u1eadp n\u00e0y gi\u1ea3i th\u00edch c\u00e1c nguy\u00ean t\u1eafc \u0111o l\u01b0\u1eddng v\u00e0 n\u1ec1n t\u1ea3ng thi\u1ebft b\u1ecb \u0111\u00e3 \u0111\u01b0\u1ee3c \u0111\u1ec1 c\u1eadp \u1edf tr\u00ean. N\u00f3 kh\u00f4ng tr\u00ecnh b\u00e0y quy tr\u00ecnh l\u00e0m vi\u1ec7c an to\u00e0n cho qu\u00e1 tr\u00ecnh l\u1eafp r\u00e1p c\u1ee5 th\u1ec3. Ngu\u1ed3n: Gaurav J \u2013 TheElectricalGuy.<\/p><div data-video-title=\"Switchgear Basics: Complete Beginner&#x27;s Guide | TheElectricalGuy\" onclick=\"var w=this;setTimeout(function(){var f=w.querySelector(&quot;iframe&quot;);if(f){f.title=w.getAttribute(&quot;data-video-title&quot;);f.loading=&quot;lazy&quot;;}},100);\" style=\"position:relative;width:100%;padding-top:56.25%\"><iframe src=\"https:\/\/www.youtube-nocookie.com\/embed\/1eLEa9uqE3k\" title=\"Nh\u1eefng \u0111i\u1ec1u c\u01a1 b\u1ea3n v\u1ec1 thi\u1ebft b\u1ecb \u0111i\u1ec7n: H\u01b0\u1edbng d\u1eabn d\u00e0nh cho ng\u01b0\u1eddi m\u1edbi b\u1eaft \u0111\u1ea7u | TheElectricalGuy\" loading=\"lazy\" allowfullscreen style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0\"><\/iframe><\/div><p><a href=\"https:\/\/www.youtube.com\/watch?v=1eLEa9uqE3k\" rel=\"noopener nofollow\" target=\"_blank\">Xem video Gi\u1edbi thi\u1ec7u v\u1ec1 thi\u1ebft b\u1ecb \u0111i\u1ec7n: H\u01b0\u1edbng d\u1eabn d\u00e0nh cho ng\u01b0\u1eddi m\u1edbi b\u1eaft \u0111\u1ea7u | TheElectricalGuy<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>A switchgear earthing switch connects a defined part of the primary circuit to earth when operated under its approved conditions. Specifying it requires more than selecting an operating handle: the project must establish<\/p>","protected":false},"author":6,"featured_media":4765,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[58],"tags":[83,88,75],"class_list":["post-4773","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-engineering-guides","tag-power-distribution","tag-procurement-rfq","tag-switchgear"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/4773","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/comments?post=4773"}],"version-history":[{"count":1,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/4773\/revisions"}],"predecessor-version":[{"id":4782,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/posts\/4773\/revisions\/4782"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/media\/4765"}],"wp:attachment":[{"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/media?parent=4773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/categories?post=4773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lbajiele.com\/vi\/wp-json\/wp\/v2\/tags?post=4773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}