Blog

Industrial three-phase autotransformer installation

Apa itu Autotransformator? Prinsip, Penggunaan, dan Batasannya

Autotransformer adalah trafo dengan satu belitan kontinu dan satu atau lebih sadapan (tap), sehingga sebagian belitan digunakan bersama oleh input dan maupun output; trafo ini dapat mengubah tegangan secara efisien dan ringkas tetapi biasanya tidak menyediakan isolasi galvanik.

Mica tapes, sheets and precision parts for transformer insulation

8 Pemasok Mika untuk Trafo di Eropa (Panduan 2026)

8 Mica Suppliers for Transformers in Europe (2026 Guide) European buyers looking for mica suppliers for transformers can start with KREMPEL, ISOVOLTA, COGEBI, Von Roll, Dr. Dietrich Müller, KEMAITE, Mica Tapes Europe…

Qualified utility crew repairing an isolated oil-filled transformer in a substation

Berapa Lama Waktu yang Dibutuhkan untuk Memperbaiki Trafo?

Fixing a transformer can take from a few hours to more than a year. A loose external connection, replaceable fuse or minor accessory fault may be corrected within 4–24 hours after safe isolation. A bushing, gasket, fan, pump or tap-changer accessory repair often takes 1–7 days if parts and qualified labor are available. Internal winding or core damage commonly requires workshop repair lasting several weeks or months. If the unit must be replaced, a stocked distribution transformer may restore service in hours or days, while a custom large power transformer can require a year or longer to manufacture and deliver.

Core balance current transformer surrounding three phase conductors and connected to a protection relay

Apa itu Trafo Arus Keseimbangan Inti? Panduan CBCT

A core balance current transformer (CBCT) is a ring-type instrument transformer used to detect earth-leakage and ground-fault current. All live conductors of a circuit pass through one magnetic core. During normal operation, their instantaneous currents add to approximately zero, so the CBCT produces almost no secondary output. If current escapes to earth, the sum is no longer zero. The resulting residual magnetic flux produces a secondary signal for an earth-fault relay. Because it measures imbalance rather than load current, a correctly selected CBCT can detect much smaller ground faults than three conventional phase CTs connected residually.

how to test a transformer — industrial electrical equipment

Cara Menguji Trafo: Metode, Urutan, dan Interpretasi

To test a transformer, begin with isolation, visual inspection and nameplate review, then select safe offline tests such as insulation resistance, turns ratio, winding resistance, excitation current and oil tests; interpret results against factory data, phase balance and historical trends. No single test proves health. Test voltage, temperature, connection, instrument accuracy and transformer type affect results. Medium- and high-voltage testing requires qualified personnel, approved procedures and controlled discharge and grounding.

3 phase transformer calculations — industrial electrical equipment

Perhitungan Trafo Tiga Fasa: Rumus & Contoh

Three-phase transformer calculations use kVA = √3 × line voltage × line current ÷ 1,000 and I = kVA × 1,000 ÷ (√3 × line voltage); ratio, impedance, voltage drop and fault current require additional transformer data.…