Engineering Case
The company will continue to expand its production scale, improve product quality,
and strive to develop the company towards a more specialized, larger-scale and internationalized direction.

Transformer
Waterborne engineering transformer equipment

Transformer
Commercial transformer for factory use

Transformer
Commercial transformer for factory use

Power supply
Power Transformation Station

Side by side in the same cabinet
Install the busbar, connect the DC screen batteries and secondary wires

Power supply
School No. 1 Power Distribution Room – Power Supply

Connect the secondary wires
Connect the secondary wires

Power Distribution Room
Install an active filter

power supply
Low-voltage power supply

Power supply
Power supply

Rectification of defects
Rectification of defects

Feed-in cabinet
Feed-in cabinet

Photovoltaic case
The 80MW fishery-photovoltaic complementaryphotovoltaic power generation project in QibuTownship, Wannian County

Photovoltaic case
Jialemei distributed Photovoltaic powerGeneration Project

Photovoltaic case
Xinyu Hushan Water Surface Photovoltaic PowerGeneration Project

Photovoltaic case
jiangxi Wannian Jing Semiconductor RooftopDistributed Photovoltaic Power Generation Project

Photovoltaic case
The 180MM fishery-photovoltaic complementary photovoltaic power generation project in Boshi Lake, Shuanggang Town, Poyang, ShangraoEcological Photovoltaic Demonstration Base

Photovoltaic case
The first phase of the 100MWp photovoltaic projectin Yangmei Longjing of the 1 million kilowatt-level new energy base of Guizhou Energy Shuicheng

Photovoltaic case
The ground distributed photovoltaic power generation construction project at the Xingyi end of the Baoservice Area on Panxing Expressway

Photovoltaic case
The distributed photovoltaic power generation project of Hangsu New Materials and Aolan Air Conditioning Technology
FAQ
Q1、How to choose the right capacity of PV step-up transformer?
A1:It should be matched with the inverter capacity, considering system efficiency, loss, and future expansion, usually selected according to 1.0–1.2 times of the total inverter power.
Q2、What are the advantages of photovoltaic prefabricated cabins?
A2:They feature factory prefabrication, short installation period, high integration, good protection, strong weather resistance, and are suitable for outdoor photovoltaic projects.
Q3、What’s the difference between a power transformer and a PV step-up transformer?
A3:A power transformer is for general power transmission. A PV step-up transformer is optimized for photovoltaic inverter output, with better adaptability to harmonics and fluctuations.
Q4、What is the function of a PV grid-connected cabinet?
A4:It realizes grid-connected control, protection, metering, switching, and safety interlock to ensure stable and compliant connection between the PV system and the power grid.
